|
COMMERCE BUSINESS DAILY ISSUE OF JANUARY 29,1997 PSA#1771Defense Supply Service-Washington, Rm 1D245, The Pentagon, Washington,
DC 20310- 5200 A -- BROAD AGENCY ANNOUNCEMENT/SUPPRESSANT FLOW THROUGH PIPING DUE
041197 POC Contact Ms. Sally Williams, Contract Specialist (703)
693-5017, Contracting Officer, Joyce Rose (703) 695-2564 BROAD AGENCY
ANNOUNCEMENT -- The Executive Director, Strategic Environmental
Research and Development Program (SERDP) is soliciting proposals to
identify and test suppressant flow through piping concepts that will
support new and more effective fire suppression technologies. [NOTE: In
addition to this BAA, proposals will be also be solicited with the
government.] BACK-GROUND: Halon 1301, used for fire extinguishment and
explosion suppression applications in fielded weapon systems and
mission-critical facilities, has been banned from national production
due to its high ozone- depleting potential. Alternatives developed by
industry to date have sizable weight and volume penalties, and their
application to fielded current weapons systems could require expending
large amounts of funding and time. Consequently, the DoD has embarked
on an aggressive new R&D program -- the Next- Generation Fire
Suppression Technology Program (NGP) -- under the technical direction
and oversight of the Office of the Director, Defense Research and
Engineering/Advanced Technology (ODDR&E/AT). The NGP goal is to develop
and demonstrate, by 2004, retrofitable, economically feasible,
environmentally-friendly and user-safe processes, techniques, and
fluids that meet the operational requirements currently satisfied by
halon 1301 systems in aircraft, ships, land combat vehicles, and
critical mission support facilities. The results will be specifically
applicable to fielded weapons systems, and will provide dual-use fire
suppression technologies for preserving both life and operational
assets. Successful candidates must perform satisfactorily in tests for
a wide variety of properties, including those reviewed by the
Environmental Protection Agency (EPA). An initial survey of fires for
which the DoD currently uses halon 1301 shows an extremely broad range
of fire conditions and several distinct hazards to be avoided. The
Military Departments and other participating government agencies will
conduct research projects within the NGP, and proposals accepted from
industry or academia for NGP research projects will be incorporated
into these programs. Additional information on the NGP, including
preliminary information about the types of fires to be suppressed, may
be found on the Internet Web site http://www.dtic.mil/ddre/, under
Science and Technology Programs, at document titled The Next-Generation
Fire Suppression Technology: Strategy for a National Program, dated
July 1996. The NGP Technical Point of Contact is Dr. Richard G. Gann,
Technical Program Manager (TPM), NGP, National Institute of Standards
and Technology (NIST), e-mail (preferred): rggann@nist.gov, phone:
(301) 975-6866; fax: (301) 975-4052. BAA OBJECTIVE: To develop and
validate a calculation methods for flow in pipes of single-and
two-phase fluids with widely varying physical properties and flow
conditions. To meet this objective, the principal investigator (PI)
should survey and evaluate existing public and proprietary codes to
identify the optimal starting point, identifying any codes that are
already sufficient to this task. If none exists, the PI should select
one near to the purpose and modify it, as needed, to include friction
losses, discharge pressures, and flow rates in piping, including terms
for all physical fluid mechanical properties. The PI should include
distribution piping for gaseous suppression agents, liquids, and dry
powder, as determined by Element 1.a. [See NGP Web Site or Contact NGP
Technical Point of Contact]. The set of agent properties needed for
the model(s) should be determined so thatunknown values can be
estimated or measured. Laboratory tests should be conducted to validate
the model for 1- and 2-phase flow under a wide range of temperatures
and pressures; and a model usable by project engineers should be
produced. PRODUCTS: The outcome of work under this Element will be
validated, available computer code for calculating single- and
two-phase flow in pipes for fluids of diverse physical properties.
Laboratory data on flows, pressure losses, friction coefficients,
Reynolds numbers, etc., for water and other suppression system fluids
in pipes under the needed range of pressures and flow velocities will
also be generated. This will enable comparison of the delivery needed
for proposed fluids within the capacity of existing piping in current
weapon systems. BACKGROUND: New generation fire suppression agents will
have physical properties different from water and halon 1301, and the
equations in current calculation programs may include simplifying
assumptions that are not suitable. There is, therefore, a need to
ensure a proper model that is applicable to current weaponsystems and
is available to all participating researchers and engineers. SERDP
Program Office Resources: The government estimate of the cost and time
to meet the requirements of this Element is $500,000 over two years,
with an estimated first year cost of $250,000. Proposers should not
consider these estimates to be either minimums or maximums; they are
provided only as estimates around which reasonable proposals may be
developed. It should be understood, also, that the government reserves
the right to fund more than one proposal either to meet this
requirement fully or to pursue more than one innovative approach; the
reasonable total cost of which might be more or less than the
government estimate. The government will consider proposals which offer
technical or cost advantages but only meet partial technical
requirements in this BAA. Estimated additional funding (cost sharing)
from performing organizations: colleges/universities and small business
firms-10% of total request: all others-33% of total request.
SUBMISSIONS: Offerers are encourages to submit concise, but
descriptive, proposals. Proposals for FY 1998 contract awards will be
accepted until 4:00 PM EST on April 11, 1997. The Proposal, including
the original signed copy, five additional copies, and one copy on a 3
1/2" diskette (DOS-formatted, MSWord 6.0 or lower, or WordPerfect) all
referencing BAA ##-## and must be submitted to: Brenda J. Batch,
Administrative Officer, SERDP Program Office, 901 North Stuart Street,
Suite 303, Arlington, VA 22203, TEL (703) 696-2123; FAX: (703)
696-2114. All technical questions concerning this BAA should be
addressed to Dr. Richard G. Gann. PROPOSALS SENT BY FAX OR E-MAIL WILL
BE REJECTED. Proposals will be selected through a
technical/scientific/business decision process with technical and
scientific considerations being most important. The primary basis for
selecting proposals shall be technical, importance to the NGP and funds
availability. Individual proposal evaluations will also consider the
acceptability or non-acceptability without regard to other proposals
submitted under the announcement; however, due to budgetary
constraints, all acceptable proposals may not be funded. No award will
be made without a proposal to perform the specific effort within an
estimated cost and time framework. Offerers, if selected, must be
willing to cooperate and exchange information in an integrated program
withother contractors chosen by the TPM. PROPOSAL CONTENT: Proposals
shall be prepared in two sections, Part I and Part II, and able to be
separated for review purposes. Part I shall provide the technical
proposal and management approach, and Part II shall address costs.
Proposals shall be prepared on 8.5 x 11 inch paper, with one and
one-half line spacing or double spaced, in no less than 11-point size,
any font. All margins (top, bottom, left, and right) shall not be less
than 1". The proposal shall address and be relevant to the listed
evalation criteria listed herein. In addition, Part I of the proposal
shall include: (a) a cover page including BAA number; proposal title;
SERDP Log Number; developed by SERDP; submitting organization, office
code, and address; Contractor DUNS Number and CAGE Code; Principal
Investigator's name, mailing address, telephone number, electronic mail
address, and facsimile machine number; Administrative/Contracting
Representative mailing address, telephone number, electronic mail
address, and facsimile machine number; total estimated cost and
duration; (b) a one-page summary of any technical ideas to be pursued
and their expected impact on the state of the art and the NGP; (c) a
statement of work detailing the scope of the proposed work and specific
utilization of subcontractors; (d) a description of results, products,
and transferable technology expected from the project; (e) a list of
the milestones and schedule; (f) a statement of the technical rationale
that substantiates the schedule and justifies the overall technical
approach of the proposal; (g) a not-to-exceed-one-page summary of any
proprietary claims to results, prototypes, or systems supporting and/or
necessary for the use of the research, results, and/or prototype (if
there are not proprietary claims this section shall consist of a
statement to that effect); (h) a section describing relevant
capabilities, accomplishments, and work in these or closely related
areas along with the qualifications of proposed subcontractors; (i) a
management plan describing the overall approach to management of this
effort, including brief discussions of total organizations, use of
personnel, project/function/subcontra ctor relationships, government
research and facility interface, and planning, scheduling and control
practices. Part I must be no longer than 15 pages (not including the
cover page, appendices or curriculum vitae). Foldouts shall be counted
as a single page. The contents of the appendices shall be limited to
figures that directly support items discussed in the text of the
proposal. If items are included in the appendices which are not covered
in the basic proposal, the proposal may not be reviewed. Proposals with
Part I in excess of 15 pages may not be reviewed. Proposals of fewer
than the maximum number of pages will not be penalized. PART II of the
proposal is not page limited, but should be very concise and address
the elements listed below and in Appendix A to this BAA. A one-page
summary will be included. Tabs, table of contents,
introduction/executive summary are neither required nor desired. Costs
shall be supported by detailed breakdowns of labor hours by labor
category and tasks/subtasks, materials, travel, computer and other
direct and indirect costs. An explanation of any estimating factors,
including their derivation and application shall be provided. Details
of any cost sharing to be undertaken by the Offerer should also be
included in the cost section. [See APPENDIX A of this BAA for
additional requirements and amplifying information concerning
preparation of Part II cost data.] ABSTRACT: Offerers, either
individual or teamed, are strongly encouraged to submit a two-page
abstract of their proposed work to preclude unwarranted effort (a) on
the part of an Offerer in preparing a full proposal and (b) on the part
of the government, in reviewing one. Page one shall be a title page
clearly labeled PROPOSAL ABSTRACT and including this BAA number,
proposal title, plus Offerers administrative and technical points of
contact along with mailing addresses, telephone and facsimile numbers,
e-mail addresses, and the signature of an authorized officer. The
second page should include a summary of the technical ideas proposed
and their anticipated deliverables, and total cost. The abstract shall
be on 8.5 x 11 inch paper, with one and one-half line spacing or
double spaced, in at least 11-point type, any font. All margins (top,
bottom, left, and right) shall not be less than 1". The original and
one copy of each abstract shall be received no later than February 21,
1997, by: Brenda J. Batch, Administrative Officer, SERDP Program
Office, 901 North Stuart Street, Suite 303, Arlington, Virginia 22203,
TEL: 703-696-2123; FAX: 703-696- 2114. A copy of the abstract should
also be sent -- preferably by e-mail -- to the Technical Point of
Contact, Dr. Richard G. Gann, by the same date. An abstract is not a
requirement for submission or selection of a proposal. Any Offerer
whose abstract is found to be consistent with the intent of this BAA
willbe invited by February 28, 1997, to submit a full technical and
cost proposal. Such an invitation does not assure subsequent contract
award. Regardless of the recommendation, the decision to submit or not
submit a proposal is the responsibility of the Offerer.
EVALUATION/AWARD PROCESS: Evaluation of the abstracts and proposals
will be performed using the following criteria, listed in descending
order of relative importance: (1) technical quality and originality of
the proposed research; (2) relevance to the NGP goal and impact on the
goal if successful; and (3) The Offerers capabilities, related
experience, facilities, techniques, or unique combinations thereof,
which are integral factors for achieving the proposed objectives; and
(4) the appropriateness and cost realism of the budget for
accomplishing the work proposed under this BAA. Proposals will be
evaluated and ranked by a Selection/Peer Review Panel chaired by the
NGP TPM. The primary basis for selecting proposals for acceptance shall
be technical importance to the NGP and funds availability. The Panel is
composed of members of the NGP Technical Coordinating Committee, the
SERDP Pollution Prevention Technical Thrust Area Working Group
(PP/TTAWG), and/or other selected reviewers as needed by the Chairman.
The Panel and the PP/TTAWG will recommend to the SERDP Executive
Director, through the Halon Alternatives R&D Steering Group (HASG), a
subset of the acceptable proposals for award which will construct a
balanced program meeting the NGP needs. These recommended proposals
will then be reviewed by the SERDP Scientific Advisory Board (SAB). The
mission of the SAB is to review all proposed SERDP funded projects and
make appropriate recommendations to the SERDP Council on technical
merit and funding. The TPM will make a concise (30 minute) presentation
of the proposals to the SAB, usually in the Washington, D.C.,
metropolitan area. Principal investigators of the recommended projects
may attend, as coordinated with the TPM, who will provide specific
guidancefor this presentation, including date, time, and location.
Contract award selections will be recommended by the SERDP Executive
Director to the SERDP Council, which will approve the proposal within
a reasonable period of time after receipt in an effort to incorporate
the work in to the NGP. The Defense Supply Service -- Washington (DSSW)
Contracts Office, the contracting agency for the NGP, will make
contract awards within a reasonable period of time. The DSS-W point of
contact is Ms. Sally Williams, telephone (703) 693-5017. A Military
Department of NIST official will be designated a Contracting Officer's
Technical Representative (COTR) for each contract, as recommended by
the NGP TPM. It is the policy of the SERDP Program Office and the DSSW
Contracts Office to treat all proposals as competitive and proprietary
information and to disclose the contents only for the purpose of
evaluation. The Government may use selected support contractor
personnel as special resources to assist in administering the
evaluation of the proposals. These persons are restricted by their
contracts from disclosing the proposal information or using it for
other than performing their assigned administrative task. Contractor
personnel are required to sign non-disclosure statements. By submission
of your proposal, you agree that your proposal information may be
disclosed to these selected contractors for the limited purpose stated
above. Any information submitted with you proposal that you do not
consent to limited release to these contractors must be clearly marked
and submitted segregated from other proposal material. This
announcement constitutes a Broad Agency Announcement as contemplated in
FAR 6.102(d)(2). There will be no formal request for proposals or other
solicitations outside the Government regarding this announcement. The
Government reserves the right to select for award all, some, or none of
the proposals received in response to this announcement. The provisions
of DFARS subpart 227.71, Rights in Technical Data, will applyto any
award issued under this BAA. All responsible sources may submit a
proposal which shall be considered. Historical Black Colleges and
Universities (HBCU) and Minority Institutions (MI) are encouraged to
submit proposals and join others in submitting proposals; however, no
portion of this BAA will be set aside for HBCU and MI participation due
to the impracticality of reserving discrete or severable areas of NGP
technology for exclusive competition among these entities. APPENDIX A
ADDITIONAL REQUIREMENTS AND AMPLIFYING INFORMATION CONCERNING
PREPARATION OF PART II COST DATA. 1. Cost Estimate: An estimate of the
total research project cost, with a break down of direct and indirect
funds by category and year, must accompany each formal proposal (PART
II). Multiple-year proposals are encouraged to cover the total
estimated duration of the project, as appropriate. Incremental funds
will be provided by SERDP to successful proposers for effort performed
during each Federal fiscal year, given that sufficient funds are
provided to SERDP and the defense requirements indicate that the
research is a continuing priority. Costs proposed must confirm with the
following regulations and principles: Commercial firms: Federal
Acquisition Regulations (FAR) Part 31 and Defense FAR Supplement Part
31, Contract Cost Principles and Procedures. Educational Institutions:
OMB Circular A-21, Cost Principles for Educational Institutions, OMB
Circular A-88, Indirect Cost Rates, Audit an Audit Follow-up at
Educational Institutions. Nonprofit Organizations: OMB Circular A-122,
Cost Principles for Nonprofit Organizations, OMB Circular A-133,
Audits of Institutions of Higher Education and Other Nonprofit
Organizations. The cost of preparing proposals in response to this BAA
is not considered an allowable direct charge to any resultant
contract, grant or cooperative agreement. It is, however, an allowable
expense to the bid and proposal indirect cost specified in FAR
31.205-18, and OMB Circulars A-21 and A-122. The budget estimate must
include the following data. a. Direct Labor Costs: Show the current and
projected salary amounts in terms of man-hours, man-months or annual
salary to be charged by the PI(s), research associates and assistants,
and the total amount per year to be paid to each from the project.
State the number of man-hours used to calculate a man-month or
man-year. For proposals from universities, the time and amounts to be
charged should be identified by academic year and summer effort. The
proposal must identify the following: 1) The basis for the direct labor
hours or percentage of effort, e.g., historical hours or estimates. 2)
The basis for the direct labor rates or salaries. Labor costs should
be predicated upon actual labor rates or salaries. These estimates may
be adjusted upward for forecast salary or wage cost-of-living
increases that will occur during the contract period. Such COLAs should
not exceed 4%, exclusive of merit increases. The proposal should
separately identify the ratio applied to base salary/wage for
cost-of-living adjustments and merit increases. Each must be fully
explained. b. Fringe Benefits and Indirect Cost Rates (overhead,
general and administrative and other): The most recent rates, dates of
negotiation, the base(s) and periods to which the rates apply must be
disclosed and a statement included to identify whether the proposed
rates are provisional or fixed. A copy of the negotiation memorandum
should be provided. If negotiat (0025) Loren Data Corp. http://www.ld.com (SYN# 0011 19970129\A-0011.SOL)
A - Research and Development Index Page
|
|