|
COMMERCE BUSINESS DAILY ISSUE OF JANUARY 31,1997 PSA#1773U. S. Army Engineer District, Savannah, P.O. Box 889, Savannah, Georgia
31402-0889 C -- ADD/ALTER C-130 SQUADRON OPERATIONS AND AIRCRAFT MAINTENANCE
UNIT, TMKH953008, -- POPE AFB, NC POC Dan Lenz, 912/652-5585 1.
CONTRACT INFORMATION: A-E services are required for preparation of a
Request for Proposals to design and build two additions to an existing
building, Option 1 -- serve on the review team for Technical
Conformance of Proposals and Option 2 -- Provide Construction Phase
Services for Add/Alter C-130 Squadron Operations and Maintenance Unit,
TMKH953008, Pope AFB, NC. This will be a firm fixed price contract.
The contract is anticipated to be awarded in March 1997 and completed
in July 1997. The estimated construction cost range is less than
$5,000.000. This announcement is open to all firms, regardless of size.
2. PROJECT INFORMATION: The work will be in three options. OPTION 1 --
The A-E will perform all Architect-Engineer services necessary in
preparation of Request for Proposals to design and build two additions,
one to each end of an existing building. The additions will be 2,200
square meters and 2,050 square meters, totaling 4,250 SM. The
successful firm will be given a Customer ConceptDocument (CCD)
developed by the Air Force. The CCD is a booklet which outlines the
project requirements. The A-E will utilize this booklet to develop the
Request for Proposals based upon Savannah District criteria. OPTION 1
-- The A-E will serve on the review team for Technical Conformance of
Proposals. OPTION 2 -- After award, the A-E will provide Construction
Phase Services. 3. SELECTION CRITERIA: See Note 24 for general A-E
selection process. The selection criteria are listed below in
descending order of importance (firms by major criteria and then by
each sub-criterion). Criteria A thru E are primary. Criteria F thru H
are secondary and will only be used as "tie-breakers" among technically
equal firms. A. Specialized experience and technical competence in: (1)
Preparation of Requests for Proposals for Design/Build contracts for
industrial buildings; (2) Design of new industrial buildings and
addition to existing industrial buildings; (3) Providing construction
phase services; (4) Use of CADD; (5) Use of MCACES Gold. The estimates
for this project shall be prepared using the latest version of MCACES
Gold Software. The software and User's Manual will be provided by the
Savannah District free of charge to the successful A-E. The drawings
will be prepared using graphics created via Intergraph/Bentley
Microstation PC version 5.0 or later or Microstation 32. Drawings
created using other CADD software must be translated to the
Microstation (*dgn) format. The Contractor will possess the software to
enable the full translation of drawing files. Before selection, the
pre-selected A-E's may be required to demonstrate the above
compatibility by reproducing a Government-supplied standard drawing and
translating it to the Intergraph/Bentley Microstation format with
proper leveling, line weights, symbology, color, etc. as described in
EM-1110-1-1807. Compliance with this requirement will be submitted as
part of the SF 255 submittal. B. Past performance on DoD and other
contracts with respect to cost control, quality of work, and compliance
with performance schedules. C. Capacity to accomplish the work in the
stated contract period and to dedicate at least one each of the
following disciplines: architectural, electrical engineer, structural
engineer, civil engineer, mechanical engineer. The design team must
include a Registered Engineer or Registered Architect who is a full
"member" in good standing of the Society of Fire Protection Engineers
(SFPE) or an individual who is a Registered Fire Protection Engineer
and whose principle duties are fire protection engineering. Disregard
the "to be utilized" statement at Block 4 of SF 255 and show total
depth of staff in all disciplines. D. Professional Qualifications of
key management and professional staff members. Resumes (Block 7 of the
SF 255) must be provided for these disciplines, including consultants.
E. Knowledge of Locality: Knowledge of locality as it pertains in
design and construction methods of projects in the geographic area of
this contract. SECONDARY CRITERIA: F.Small Business, Small
Disadvantaged Business, and Women Owned Business Participation: Extent
of participation of small business, small disadvantaged businesses,
women owned business, historically black colleges and universities, and
minority institutions in the proposed contract team, measured as a
percentage of the total estimated effort. G. Equitable Distribution of
DoD Contracts: Volume of DoD contract awards in the last 12 months as
described in Note 24. 4. SUBMISSION REQUIREMENTS: See Note 24 for
general submission requirements. Interested firms must submit ONE (1)
copy of SF 255 (11/92 edition) for prime and ONE (1) copy of SF 254
(11/92 edition) for prime and all consultants to the following address:
U.S. Army Engineer District, Savannah, ATTN: CESAS-EN-EA, 100 W.
Oglethorpe, Savannah, GA 31401, not later than the close of business on
the 30th day after the date of this announcement. If the 30th day is a
Saturday, Sunday, or Federal Holiday, the deadline is the close of
business of the next business day. NO FAXED SUBMITTALS WILL BE
ACCEPTED. FIRMS MUST INCLUDE PRIME's ACASS NUMBER in Block 3b of SF
255. For ACASS information call 503/326-3459. Cover letters and
extraneous materials (Brochures, etc.) will not be considered. PHONE
CALLS are DISCOURAGED unless ABSOLUTELY necessary. PERSONAL VISITS for
the purpose of DISCUSSING this announcement will NOT BE SCHEDULED.
THIS is NOT a REQUEST for a PROPOSAL. (0029) Loren Data Corp. http://www.ld.com (SYN# 0031 19970131\C-0006.SOL)
C - Architect and Engineering Services - Construction Index Page
|
|