|
COMMERCE BUSINESS DAILY ISSUE OF FEBRUARY 11,1997 PSA#1780USPFO for South Dakota, 2823 W Main, Rapid City, SD 57702-8186 C -- ARCHITECT & ENGINEER SERVICES SOL DAHA39-97-R-0001 DUE 032497 POC
Lt Col David Holman, SDANG Base Civil Engineer, (605/333-5785) or 1LT
Scott T. Petrik, Contracting Specialist, USPFO for South Dakota,
(605/399-6738) 7 February 1997 SDPFO-PC SUBJECT: Synopsis of
Procurement Information Correction-Disregard previous announcement for
A/E Services referencing DAHA39-97-R-0001. The following is the
correct information. This will be an Indefinite Delivery Indefinite
Quantity Architect/Engineer (A/E) contract under which specific
delivery orders will be negotiated and issued. Required A/E services
may include investigative services, design services, and inspection and
testing services, at the option of the Government. The maximum fee for
any one delivery order shall not exceed $150,000. The cumulative
amount for all delivery orders shall not exceed $200,000 per year. Past
history indicates that against DAHA39-93-D-0001 (base + 1 option year)
approximately $129,376.00 was awarded in delivery orders and against
DAHA39-95-D-0001 (base + 1 option year) the amount awarded to date is
approximately $24,656.02. The minimum amount of the contract will total
at least $5,000. The contract will be in effect for one year from date
of award, with Government option to extend the term of the contract
for one additional year. The total duration of the contract, including
any options, shall not exceed two years. Selected firm must maintain
a minimum amount of insurance, as required by the contract, throughout
the duration of the contract. This is an unrestricted procurement.
This is not a request for a price proposal. The type of work for the
proposed Indefinite A/E may include, but is not limited to, a) Energy
Management, b) Street/utilities/traffic improvements, c) Interior and
exterior building modifications including structural, mechanical, and
electrical work. Significant A/E evaluation factors, in order of
relative importance to the Government, are: 1) Professional
qualifications necessary for satisfactory performance of a wide range
of services by at least one person in the disciplines of: Electrical
Eng, Mechanical Eng, Architecture, Structural Eng, Civil Eng, Fire
Protection Eng; 2) Specialized experience and technical competence of
the in-house or consultant firm in design of minor construction,
alteration, maintenance, and repair of facilities similar to those of
the South Dakota Air National Guard; 3) Capacity to accomplish the work
in the required time as evidenced by the current workload, as well as
availability (not related to location) of key personnel to design
projects at any time; 4) Past performance on contracts with government
agencies and private industry in terms of cost control, quality of
work, and compliance with performance schedules to be supported with
submittals' to include, but not be limited to, the following: A)
Project Information-(1) Project Name, (2) Owner Name and Telephone
Number, (3) Pre-bid cost estimate by A/E, (4) Pre-bid estimate for
completion time, (5) Original Contract Amount, (6) Number of Change
Orders, a)Design Deficiency, b)Owner Requested, (7) Final Contract
Amount, (8) Actual Completion Date; B) Letters of
Recommendation/Commendation 5) Location of the main or branch office,
with whom the contract will be signed, with respect to that firm's
proximity to Sioux Falls, SD; 6) Demonstrated success in prescribing
the use of recovered materials and achieving waste reduction and energy
efficiency in facility design. The A/E's SF Forms 254 and 255 shall
include previous work accomplished for the Air National Guard in the
past five years (not limited to South Dakota). The successful A/E is
expected to provide AutoCad Version 12 products and provide cost
estimates utilizing the most current RS Means software. The successful
A/E will be ineligible to compete for A/E design contracts for any
project(s) which he assisted in developing the project book and/or the
statement of work while under the indefinite delivery contract. Please
note that, where the above evaluation factors differ from those listed
in Note 24 of this publication, in terms of both content and priority
the evaluation factors as listed above take precedence for this
project. A/E firms which meet requirements described above are invited
to submit a completed SF254 and SF255, Architect/Engineer and Related
Services Questionnaires (specific to this project) to Lt Col David
Holman, Base Civil Engineer South Dakota Air National Guard, Joe Foss
Field Bldg #47, PO Box 5044, Sioux Falls, SD 57117-5044 by close of
business 24 March 1997. See Numbered Note 24.***** Scott T. Petrik
First Lieutenant, SDARNG Contract Specialist (0037) Loren Data Corp. http://www.ld.com (SYN# 0024 19970211\C-0003.SOL)
C - Architect and Engineering Services - Construction Index Page
|
|