|
COMMERCE BUSINESS DAILY ISSUE OF FEBRUARY 11,1997 PSA#1780USDA Forest Service, P.O. Box 25127, Lakewood, CO 80225 R -- CURLEW WASTEWATER A&E DESIGN, PART I OF II SOL RFP RMAST-97-29
DUE 033197 POC Contact J.B. Hite, Procurement Assistant, 303/275-5274
Provide a complete wastewater disposal design for the Curlew Job Corps.
The design will be based on an approved engineering report. The report
has been approved by the Departments of Ecology (DOE) and Department
of Health (DOH). It recommends reconstruction of failed absorption beds
and separating the cafeteria waste stream with separate septic tanks
and drainfields. The approximate Center population is 243 persons. The
design shall contain plans, specifications and a cost estimate. It
shall be approved by the DOE and DOH. All plans shall be provided on
Autocad Version 13.0. All specifications shall be provided on Microsoft
Word, Version 6.0 or 7.0, and shall be in CSI format. The evaluation
priority weight (PW), is as follows: 1=low priority, 10=high priority.
Evaluation factors are as follows: (1). Specialized experience and
technical competence in doing wastewater system analysis in similar
projects, PW=5; (2). Capacity to accomplish work in the required time,
PW=5; (3). Knowledge of Washington State requirements for waste
treatment systems, PW=5; (4). Professional capabilities, PW=3; (5).
Past performance on contract of similar nature with respect to cost
control, quality of work and compliance with the performance schedule,
PW=3; (6). Geographical location and knowledge of locality of the
project, provided that application of the criterion leaves an
appropriate number of qualified firms, given the nature and size of the
project, PW=3; (0038) Loren Data Corp. http://www.ld.com (SYN# 0080 19970211\R-0016.SOL)
R - Professional, Administrative and Management Support Services Index Page
|
|