|
COMMERCE BUSINESS DAILY ISSUE OF FEBRUARY 18,1997 PSA#1784Operational Contracting Division, 127 FW/LGC, 29553 George Ave., --
Bldg 303, Room 114, Selfridge ANG Base MI 48045-5399 Z -- PRESOLICITATION NOITCE, UPGRADE GEORGE AVENUE AND GENERAL ANDREWS
DRIVE, VGLZ952023 POC Paula J. DeShon, Contracting Officer,
(810)307-5989/4881 WEB: Operational Contracting Division, 127 WG/LGC,
Selfridge ANGB MI, 131.4.32.81. E-MAIL: Services and Construction
Branch, Selfridge ANGB MI, pdeshon@mimtc.ang.af.mil. Provide all plant,
labor, materials, transportation, facilities and supervision to repair
George Avenue and General Andrews Drive at Selfridge Air National
Guard Base, Michigan. Work includes, but is not limited to, the
replacement of approximately 2 miles of 2 lane asphalt and asphalt
overlayed concete roadway and associated sidewalks, curbs, gutters and
storm drainage structures and drain lines. Also included is the
replacement of sections of the underground infra structure (storm and
sanitary drains and structures/lines, communication and electric cables
and ducts, etc.). The new pavement will consist of approximately 5
inches of asphalt pavement on 8 inches of new aggregate over a
rubbleized asphalt subbase. All work is to be in strict accordance with
the plans and specifications for Project VGLZ952023, "Upgrade George
Avenue and General Andrews Drive". The project is to be constructed in
a minimum of three phases. Each phase is to be completed prior to the
start of the next phase. Estimated start date for construction is 15
August 1997. Performance period is 90 calendar days for the entire
project. Estimated magnitude of construction is between $1,000,000 and
$5,000,000. All responsible sources may submit a bid which will be
considered for award. This is an unrestricted solicitation. (0044) Loren Data Corp. http://www.ld.com (SYN# 0185 19970218\Z-0030.SOL)
Z - Maintenance, Repair or Alteration of Real Property Index Page
|
|