|
COMMERCE BUSINESS DAILY ISSUE OF FEBRUARY 19,1997 PSA#1785Arnold Engineering Development Center, ATTN: PKP, 100 Kindel Drive,
Suite A332, Arnold AFB TN 37389-1332 41 -- UPGRADE C-PLANT REFRIGERATION SYSTEM SOL F40650-97-R-0016 DUE
041097 POC Alan Fudge, Contracting Officer, 615-454-4406 Upgrade seven
existing Carrier refrigeration systems in the second, third, and
fourth stages of the pressurized air coolers in the Engine Test
Facility C-Plant at Arnold Engineering Development Center Tennessee.
Each of the seven systems shall be renovated to convert from R12
refrigerant to R134a refrigerant. Each system is composed of a
refrigeration unit, brine circulation system, and heat exchanger coils.
Rated tonnage capacity of the seven systems are: one system at 3800
tons, two systems at 3500 tons, three systems at 3333 tons, and one
system at 2200 tons. Each conversion shall be done during a 90 day
downtime. See Note 12. Any responsible source may submit an offer which
shall be considered. See Note(s): 12. (0045) Loren Data Corp. http://www.ld.com (SYN# 0188 19970219\41-0001.SOL)
41 - Refrigeration, Air Condition and Air Circulating Equipment Index Page
|
|