|
COMMERCE BUSINESS DAILY ISSUE OF FEBRUARY 20,1997 PSA#1786Electronic System Center, Operational Contracting Construction Branch
(ESC/PKOC), 104 Barksdale St., Hanscom AFB, MA 01731-1806 Z -- PROTOTYPE GEOTHERMAL HEATING AND COOLING SYSTEM, BLDG 1825,
HANSCOM AFB, MA SOL F19650-97-B0009 DUE 043097 POC Michael Cunningham
Contract Specialist (617) 377 2706 Edna Alonis Contracting Officer
(617) 377 3247. Notice of contract action for the purpose of issuing a
full and open competitive solicitation to replace the existing
domestic hot water, heating, ventilation, and air conditioning (HVAC)
system and controls with a design and build, turnkey four seasons water
source geothermal heat pump system in Bld 1825 Hanscom AFB, MA. The
following are minimum qualifications the contractor must possess: The
contractor shall have installed five or more standing column wells in
the New England region within the past 60 months. The contractor shall
be a certified well driller and member in good standing of the
National Ground Water Assoc. The contractor must posses a valid
International Ground Source Heat Pump (IGSHPA) installer certificetion.
The period of performance for this project will be 120 calender days.
The magnitude of construction is $100,000 to $250,000. This is a
firm-fixed price contract. All firms interested in receiving a copy of
the IFB should respond in writing within 15 days calender days of this
publication to ESC/PKOC 104 Barksdale St. Hanscom AFB, MA 01731-1806,
Attn Michael Cunningham. Requests can also be faxed to (617) 377 4324
Attn. Michael Cunningham. (0049) Loren Data Corp. http://www.ld.com (SYN# 0175 19970220\Z-0029.SOL)
Z - Maintenance, Repair or Alteration of Real Property Index Page
|
|