COMMERCE BUSINESS DAILY ISSUE OF FEBRUARY 24,1997 PSA#1788Alliant Techsystems Incorporated, Allegany Ballistics Laboratory, PO
Box 210, State Route 956, Rocket Center, (Mineral County) WV 26726 X -- BUILDING 300 RESTORATION, PHASE I SOL PHC-211 DUE 042297 POC
Point of Contact -- Patrick H. Cunningham, 304-726-5047 The work
involved for the existing three story 118,000 square foot
administrative building consists of demolishing building components to
the limit of the existing structural system and performing structural
modifications and improvements. Existing building components to be
demolished include asbestos; non-load bearing stud, concrete masonry
unit, and concrete partitions; ceiling and floor finishes; build-up
roofing; exterior enclosure; lighting and electrical systems; plumbing
and mechanical systems; and incidental related items. Structural
modifications and improvements to be performed include installing
lateral stability bracing; installing steel framing, metal deck, and
concrete fill floor systems at existing high bay areas; replacing
offset floor and roof conditions; replacing deteriorated framing; and
incidental related items. Term of the effort is 150 calendar days.
Estimated range for the total effort is between $2,500,000 and
$5,000,000. Plans and Specifications will be available on or about
March 22, 1997. Bonds will be required. West Virginia Contractors
License must be submitted prior to commencement of work by Contractor
and all Subcontractors. $35 non-refundable fee payable to Alliant
Techsystems Inc. must be submitted with written request to obtain plans
and specifications. Alliant reserves the right to refuse written
requests for plans and specifications after March 22, 1997. (0051) Loren Data Corp. http://www.ld.com (SYN# 0114 19970224\X-0001.SOL)