COMMERCE BUSINESS DAILY ISSUE OF FEBRUARY 25,1997 PSA#1789U.S. ARMY CORPS OF ENGINEERS, TRANSATLANTIC PROGRAMS CENTER, P. O. BOX
2250, WINCHESTER VA 22604-1450 99 -- LOGISTICAL SUPPORT FOR U.S. FORCES IN HUNGARY, CROATIA AND
BOSNIA SOL DACA78-97-R-0018 DUE 033097 POC Contract Specialist Karen
Stotler (540) 665-3687 e-mail: Karen.S.Stotler@usace.army.mil
Contracting Officer Robert W. Gruber, Jr. (540) 665-3672 e-mail:
Robert.W.Gruber@usace.army.mil (Site Code DACA78) The U.S. Army Corps
of Engineers intends to award an Indefinite Delivery/Indefinite
Quantity contract to Brown and Root Services Corporation of Houston,
Texas, for continuation of a full range of temporary construction and
logistical support services to the U.S. Forces which include, but are
not limited to, troop housing and facilities, food services, laundry
service operations, base camp and equipment maintenance, shuttle bus
and transporation services, road repair/maintenance, snow and ice
removal, railhead operation/RTCH services, water production and
distribution, cargo and material handling services for the U.S. Army
Europe's Area of Operation for Operation Joint Guard. This follow-on
contract is justified under FAR 6.302-1. Critical mission performance
periods will require rapid frequent mission adjustments. During these
periods, only the current contractor can successfully meet the
requirements, cost effectively within the time required to assure
uninterrupted continuation of necessary services,with minimum risk to
the health and safety of the troops. Also, during these periods, major
troop rotations and projected local elections will occur with a
resultant freeze on troop deployments/redeployments and limitations of
movement within the area of operation. As a result, it is critical to
ensure continuity of services to the troops and thus ensure mission
success. In addition, awarding to any other source would result in
substantial duplication of cost to the Government that is not expected
to be recovered through competition. Based on historical cost data,
some of the estimated duplicated costs would be
mobilization/demobilization, personnel duplication required for
transition, contractor start-up costs, such as recruiting and
processing of personnel and the renegotiation of all subcontracts and
agreements with local governmental entities. The period of performance
is from May 27, 1997 through May 26, 1998 with two (2) additional six
(6) month option periods to renew. This is not a request (0052) Loren Data Corp. http://www.ld.com (SYN# 0477 19970225\99-0005.SOL)