|
COMMERCE BUSINESS DAILY ISSUE OF MARCH 3,1997 PSA#1793Arnold Engineering Development Center, ATTN: PKP, 100 Kindel Drive,
Suite A332, Arnold AFB TN 37389-1332 K -- MODIFY FIBERGLASS BELLMOUTH SOL F40650-97-Q-0033 DUE 031797 POC
Sue Tate, Contract Specialist (615)454-7801 Arnold Engineering
Development Center (AEDC) has a need for the modification of a C2
bellmouth. Work entails cutting off the existing bell at a precise
location and reattaching a new end treatment. Contractor will be
required to pre-manufacture the new end treatment and all tooling and
fixtures necessary to complete modification in accordance with AEDC
drawings. The manufactured end treatment must match exactly the
chemical characteristics of the existing bellmouth. AEDC does not have
available the chemical characteristics of the existing bellmouth. This
modification must be complete before 1 July 1997. This procurement is
being considered for a sole source contract to AutoAir Composites, Inc.
Responses must be received not later than 15 days after date of
publication of this announcement. Firms responding to this synopsis
should do so in writing and indicated whether they are or are not a
small business, or a small disadvantaged business. You may send
requests by facsimile to (615)454-7330. See Note(s): 22. (0058) Loren Data Corp. http://www.ld.com (SYN# 0078 19970303\K-0002.SOL)
K - Modification of Equipment Index Page
|
|