|
COMMERCE BUSINESS DAILY ISSUE OF MARCH 3,1997 PSA#1793Rock Island Arsenal, ATTN: SIORI-CT, ROCK ISLAND, IL 61299-5000 Z -- PLUMBING, HEATING, AND AIR CONDITIONING SOL DAAA08-97-Q-0157 DUE
040497 POC Contract Specialist Tami L. Lord (309) 782-8564 (Site Code
DAAA08) PROJECT NUMBER: 142-96. LOCATION: Rock Island Arsenal, Rock
Island, IL, Building 68. SCOPE OF WORK: Furnish all plant, labor,
equipment, and material for installing heat tape system in Building 68
in accordance with RIA drawings 068-134, dated 2 Oct 96, sheets 1-3.
The principal features of the work includes but not limited to the
following: 1) Install heat tape in gutter and downspouts at Building
68; 2) Install a transformer, load center, and controls in Building 67.
Run 480 volt power from existing bus duct in Building 66. COST RANGE:
Between $25,000 -- $100,000. TYPE OF CONTRACT: Firm Fixed Price
Construction. DURATION OF CONTRACT PERIOD: Complete not later than 120
calendar days after receipt of notice to proceed. APPROXIMATE ISSUE
DATE: 21 Mar 97 with closing date 14 days from issue. Firms intersted
in receiving solicitation package should FAX (309) 782-6727/3721 or
call (309) 782-8638, Eileen Ray. All responsible sources may submit a
quote which shall be considered by the agency. The proposedcontract
listed here is unrestricted. Home Page Access:
http://www.RIA.ARMY.MIL/. (0058) Loren Data Corp. http://www.ld.com (SYN# 0174 19970303\Z-0047.SOL)
Z - Maintenance, Repair or Alteration of Real Property Index Page
|
|