COMMERCE BUSINESS DAILY ISSUE OF MARCH 7,1997 PSA#1797U S Postal Service, Facilities Service Office, 8055 E Tufts Avenue,
Suite 400, Denver, CO Y -- PREQUALIFICATION STATEMENTS ARE SOLICITED FROM CONTRACTORS
INTERESTED IN BEING PLACED ON THE PREQUALIFIED CONTRACTORS LIST FOR
CONSTRUCTION OF A NEW CONSTRUCTION OWNED POSTAL FACILITY SOL
072976-97-A-0096 DUE 040497 POC Donna Johnson (303)220-6538, Contract
Administration; Joel Roitenberg (303)220-6524, Project Manager; Mike
Smith (303)751-0741, Project Architect, Merrick & Company This is a
notice of intent to prequalify the most highly qualified General
Contractors for the construction of a new Main Post Office/Delivery
Distribution Center facility in Golden, Colorado. The work will
include, but not limited to, earthwork, installation of site and
building retaining walls, concrete curb & gutter, concrete and asphalt
paving, concrete sidewalks and ramps, a post-tension slab-on-grade
foundation system, lightweight integral steel stud and precast concrete
curtainwall panel system, lightweight integral steel stud and precast
concrete bearing wall panel system, integrally colored concrete
masonry, metal windows and storefront system with insulated glazing,
fully adhered EPDM membrane roof on rigid insulation, the design and
installation of factory-finished metal carrier loading canopy system,
electro-hydraulic dock levelers and flip ramps, facility electrical and
mechanical systems, a fire sprinkler system, complete audio-visual
security camera system, steel columns, joists, andjoist girders, site
lighting, metal fencing and site signage, paint striping, and
landscaping. The interior of the facility will consists of painted
gypsum board walls ceramic tile, vinyl composition tile, and carpeted
floors, asphalt plank flooring, acoustical tile and painted gypsum
board ceilings, hollow metal doors and frames, wood doors, custom
millwork with laminate finishes, and the preparation, finishing, and
installation of Postal-provided equipment. The facility is an
approximate 72,000 square foot facility that will be constructed on a
9.9 acre site. The estimated cost range of the project is $7,500,000 to
$8,500,000 and will be completed within a 385 calendar day time frame
starting with the Notice to Proceed. Planned construction starting date
is July 1, 1997. Prequalification statements will be evaluated by the
contracting officer's General Contractor Prequalification Selection
Board and all firms will be advised within 60 days after April 4, 1997.
Primary factors that will be considered are: experience, management
plan, organization, financial capability, and backlog. Other factors to
be considered will include: past performance, self-performed work and
MBE and WBE. Firms selected as being the most highly qualified will be
placed on the prequalification list for the Golden, Colorado -- Main
Post Office/Delivery Distribution Center. Interested firms may obtain
a Contractor Prequalification Package by written request to: Facilities
Service Office, Attn: Donna Johnson, 8055 East Tufts Avenue, Suite 400,
Denver, Colorado 80237-2881, or by faxed requests to (303)220-6552.
General Contractor Qualification Statement Packages will not be
returned. Firms are encouraged to send submittals via US Postal Service
First Class, Priority or Express Mail. This is not a request for
proposal. (0064) Loren Data Corp. http://www.ld.com (SYN# 0150 19970307\Y-0027.SOL)
Y - Construction of Structures and Facilities Index Page
|
|