COMMERCE BUSINESS DAILY ISSUE OF MARCH 10,1997 PSA#1798NASA/Lewis Research Center, 21000 Brook Park Road, Cleveland, OH 44135 Z -- IRT HEAT EXCHANGER REPLACEMENT PROJECT AT THE NASA LEWIS RESEARCH
CENTER, CLEVELAND, OHIO SOL IFB3-071590 POC Erick N. Lupson,
Contracting Officer, Phone (216) 433-6538, Fax (216) 433-5489, Email
Erick.N.Lupson@lerc.nasa.gov -- Erick N. Lupson, Contracting Officer,
Phone (216) 433-6538, Fax (216) 433-5489, Email
Erick.N.Lupson@lerc.nasa.gov WEB: Click here for the latest information
about this notice,
http://procurement.nasa.gov/EPS/LeRC/date.html#IFB3-071590. E-MAIL:
Erick N. Lupson, Erick.N.Lupson@lerc.nasa.gov. This project involves
the replacement of the existing Icing Research Tunnel, Bldg. 11, Heat
Exchanger and the complete C -- D leg of the tunnel, including tunnel
structure, flow surface and corner C and D turning vanes located at the
NASA Lewis Research Center, Cleveland, Ohio. New fan outlet guide
vanes, the relocation of existing natural gas and nitrogen storage
tanks, chilled water and service air utilities are also included in the
project. The work scope involves the removal of the existing 7650 sq.
ft. "W- shaped" heat exchanger (copper tubes w/galvanized fins),
demolition of the C -- D tunnel leg completely, including flow surface,
tunnel structural steel, turning vanes (corners C and D ), and
foundations. Site work includes removal and replacement of two 10"
ductile iron chilled water lines (approx. 150 ea.) and relocation of
existing natural gas and nitrogen storage tanks. General Trades work
includes excavation under the the new tunnel area for a 2 meter deep
crawl space area and installation of new foundations and poured
concrete crawl space walls. Steel work includes fabrication of a new
tunnel structure and flow surface (8-10 mm thick steel plate),
extending approximately 6 meters larger then the old C -- D tunnel leg.
Application of spray-on insulation (approx. 50 mm thick) to the outer
surface of the tunnel skin, installation of insulated metal panels on
the sides and underneath the tunnel and installation of a secondary
roof structure with a metal deck and EPDM roofing system will be
required. Fabrication of 16 corner C and 16 corner D fiberglass turning
vanes (approx. 1.5 meter chord lenght by 9 meters high), and
fabrication of 13 fiberglass and carbon fiber fan outlet guide vanes
(approx. 2 meter chord lenght by 2.5 meters high) will be needed. The
new heat exchanger will be a 2 section, 8 module, flat face aluminum
tube and fin heat exchanger consisting of 25 mm diameter tubes
approximately 8 meters long by 16 tube rows deep, (new tunnel cross
section will be approx. 9 meters high by 16 meters wide at the heat
exchanger). Mechanical work includes installation of 8" to 45" carbon
steel refrigerant piping and 72 (1" to 6") isolation and control
valves, as well as 24 pressure regulators (with pneumatic resets).
Controls and instrumentation includes 16 thermocouples for corner C and
24 thermocouples for corner D, pressure transducers and refrigerant
system monitoring instrumentation connected to the existing
Westinghouse WDPF system in the IRT control room and in the Refrigerant
Plant, Bldg. 9. Other electrical work includes relocation of conduits
and tunnel lighting fixtures. All responsible sources may submit a bid
which shall be considered by the agency. Fixed Price Contract is
contemplated Construction Cost Estimate is between $1,000,000.00 and
$5,000,000.00. Solicitation Forms will be made available as soon as
opening date is established. Options or Additives may be part of the
Construction package for additional work. Requests for copies of this
proposed procurement should be received as soon as possible in order to
facilitate mailing of same to the extent copies are available directly
to the inquirer at time of issuance. (0065) Loren Data Corp. http://www.ld.com (SYN# 0107 19970310\Z-0004.SOL)
Z - Maintenance, Repair or Alteration of Real Property Index Page
|
|