Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF MARCH 17,1997 PSA#1803

Officer in Charge of Construction, P. O. Box 209 Oceanside, CA 92049- 0209

X -- LEASE OF RELOCATABLE FACILITIES AT THE MARINE CORPS BASE, CAMP PENDLETON, CALIFORNIA SOL N68711-97-Q-6318 DUE 032897 POC Plan issue or the Contract Specialist, Al Munoz at (619) 725-3222. The Contracting Officer is E. Charette. E-MAIL: Officer in Charge of Construction, Camp Pendleton, California, amunoz@efdswest.navfac.navy.mil. This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Federal Acquisition Regulation (FAR) Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotations are being requested and a written solicitation will not be issued. This solicitation is being issued as a Request for Quotations (RFQ). The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 90-45. This solicitation is 100% set-aside for small business concerns. The Standard Industrial Code (SIC) is 2452. The size standard is 500 employees. The work will include all labor, supervision, tools, materials, equipment, transportation and facilities necessary to provide modification, delivery, set-up, leveling, tie-down, maintenance, take- down and removal of one 8' X 20' mobile modular office trailer with an occupancy code of B-2 at the Marine Corps Base, Camp Pendleton, California and incidental related work This requirement shall be a firm fixed price contract for trailer rental in accordance with the specifications stated herein. The contract schedule will be as follows: Item 0001 -- Modification of relocatable facilities to meet contract specifications. Item 0002 -- Deliver, assemble, level, anchor and set-up of relocatable facilities. Item 0003 -- Monthly rental of relocatable facilities including landings and stairs per month for twelve months. Optional Item 0004 -- Take down and removal of relocatable facilities. First option period line items: Items 0101 and 0102 will not be used. Items 0103 and 0104 bear the same description as items 0003 and 0004 for the first option period. Second option period line items: Items 0201 and 0202 are not used. Items 0203 and 0204 bear the same descriptions as items 0003 and 0004 for the second option period. The optional take down and removal, items 0004, 0104 and 0204 are independent and only one of them willbe ordered. The rental period shall begin from the date of contractor completion of delivery and set-up and Government acceptance of the facilities. Quotes must be submitted on all items. The relocatable facilities shall be set up and ready for occupancy 30 days after award of this contract. The Contractor shall furnish the relocatable facilities, all parts, equipment, materials, supplies and tools necessary for the performance of the work of this contract. The relocatable facilities provided shall meet B 2 occupancy standards for commercial coach building as approved by the Department of Housing for the State of California, and shall be clean and capable of remaining in good condition for the term of this contract. The relocatable facilities shall be approximately 160 square feet [8' X 20'], and shall be set up on location and according to appropriate codes and regulations. The relocatable facilities, at the site, shall comply with the Uniform Building Code seismic, wind, and static loading requirements forthe occupancy indicated. The relocatable facilities shall be neutral in color, i.e. white, beige, tan or light grey siding with contrasting trim color. STAIRS AND LANDING. Provide and install the required minimum size of landing and stairs. The stairs and landing shall be rigidly constructed and coated with a non-skid surface; have handrails, guardrails and meet all applicable requirements of the Uniform Building Code. WINDOWS. Provide four (4) sliding windows with screens. Windows shall be 46" X 39" (or comparable) bronze aluminum frames and evenly spaced in exterior walls. WINDOW COVERINGS. Window covering shall be white mini- blinds. DOORS. Provide one (1) exterior metal clad door with deadbolt and hydraulic closer. Doors shall meet applicable requirements of NFPA 101. WALLS. All interior walls shall have 1/4" prefinished wood paneling. FLOOR COVERING. Provide 1/8" commercial grade (neutral color) vinyl floor covering throughout. ELECTRICAL WIRING AND EQUIPMENT. Comply with the requirements of NFPA 70, the California State electrical Safety Code, and the following requirements: (1) PANELBOARD: Circuit breaker type for connection to 60 amp single phase, 120 volt feeder. Extend service connections through exterior of trailer and bring together in one location ready for service connection. Provide riser with weather head approximately 3 feet above top of trailer with 5 feet of copper wire for connection). The Government will make service connection. (2) RECEPTACLES: Provide at a minimum four (4) each, 120 VAC, NEMA 5-20R, duplex 20A 3-wire grounding type convenience receptacles spaced in accordance with applicable codes. (3) LIGHTING: Diffused fluorescent lighting. HEATING AND AIR CONDITIONING SYSTEM Provide electric heating and air conditioning units thermostatically controlled and capable of maintaining interior temperature above 65o F. when outside temperature is 40o F and below 650 F. when outside temperature is 100o F. Normal office occupancy and heat generating equipment shall be considered when sizing equipment and maintaining interior temperature. TELEPHONE OUTLETS Provide and install (4) wired telephone jacks adjacent to electrical outlets. Boxes shall be flush mounted with conduit stubbed 6" below the trailer floor at each location. Need to provide 2" ADP penetration at four (4) locations adjacent to electrical outlets. TAKE DOWN AND REMOVAL. Take down and removal of the relocatable facilities shall occur within 10 working days after the contract has expired. The Contractor shall notify the Contracting Officer in writing prior to the first day of the take-down and removal process to arrange for a joint inspection to identify any damages or discrepancies. CONTRACTOR AVAILABILITY The Contractor shall be available at all times while work is being performed on this contract. Telephone calls to the contract superintendent shall be responded to within 60 minutes. WORK SCHEDULE The schedule shall list the start date and time and the estimated time of completion. The work schedule shall be submitted to the Contracting Officer for approval at the pre-performance meeting. Once approved, all work shall be performed in strict compliance with the work schedule to facilitate the Government's inspection of the work. Changes to the work schedule shall be submitted for the Contracting Officer's approval at least three working days prior to performance. PRE-PERFORMANCE CONFERENCE: A Pre-performance conference will be held within 3 days prior to the Contractor beginning work to discuss the general terms of the contract. The Government will not be liable to the contractor for any damage attributable to reasonable wear and tear. Additional information not having a bearing on the price of quotations will be provided with the offer of award to the potential awardee, including area maps, office location and Government points of contact. The provision at FAR 52.212-1, Instructions to Offerors -- Commercial Items, applies to this acquisition. Offerors should submit a completed copy of the provision at FAR 52.212-3, Offeror Representations and Certifications -- Commercial Items, with its offer. The clauses at FAR 52.212-4, Contract Terms and Conditions -- Commercial Items and FAR 52.212-5, Contract Terms and Conditions Required to Implement Statutes or Executive Orders -- Commercial Items apply to this acquisition and will form a part of any resulting contract. FAC 5252.217-9301, Option to Extend the Term of the Contract -- Services (JUN 1994) a. The Government may extend the term of this contract for a term of one to twelve months by written notice to the contractor within the performance period specified in the Schedule; provided that the Government shall give to the contractor a preliminary notice of its intent to extend before the contract expires. The preliminary notice does not commit the Government to an extension. b. If the Government exercises this option, the extended contract shall be considered to include this option provision. c. The total duration of this contract, including the exercise of any options under this clause, shall not exceed 36 months. Offers are due no later than 4:00 P.M. Local Time, March 28, 1997. Offers may be mailed, hand delivered or facsimile transmitted to OICC, Building 22101, Marine Corps Base, Camp Pendleton, P. O. Box 209, Oceanside, CA 92049-0209. Telephone number for fax transmission is (619) 725-3222 or (619) 725-8210. The point of contact for information regarding this solicitation is Al Munoz, Contract Specialist at (619) 725-3525. (0071)

Loren Data Corp. http://www.ld.com (SYN# 0090 19970317\X-0001.SOL)


X - Lease or Rental of Facilities Index Page