COMMERCE BUSINESS DAILY ISSUE OF MARCH 19,1997 PSA#1805Federal Highway Administration, Central Federal Lands Highway Division
(HPA-16), 555 Zang St., Lakewood, CO 80228 Y -- SINGLE AWARD FOR TWO PHASED DESIGN-BUILD CONTRACT FOR HIGHWAY
DESIGN AND CONSTRUCTION SERVICES IN YOSEMITE NATIONAL PARK SOL SOL
DTFH68-97-R-00016 DUE 042997 POC POC: Craig Actis or Thomas Puto, (303)
969-5932/Contracting Officer: Edward Voelsing, (303) 969-5932 In
accordance with Public Law 104-106 (41 U.S.C. 251(3), the Central
Federal Lands Highway Division (CFLHD) office is conducting a "two
phased" design-build (DB) selection. The CFLHD is soliciting written
expressions of interest from design-build firms/teams desiring to
participate in Phase One -- Qualifications Based Selection -- of this
"two phased" selection approach. The project is located entirely within
Yosemite National Park, California and the expected work will be on the
El Portal roadway (California State Highway 140) between the El Portal
entrance station and the Pohona bridge crossing. The work anticipated
by CFLHD includes 12.027 kilometers of full asphalt roadway
reconstruction, safety improvements including roadway widening and
minor realignments, extensive fill slope retaining walls, removing and
resetting substantial lengths of rock faced guard wall and
considerable drainage improvements. All exposed retaining and guard
wall faces will require rock or simulated rock facing. The work is in
a very environmentally sensitive area. The National Park Service is
partnering with CFLHD during the design and construction efforts. The
estimated design and construction cost will be between $20,000,000 and
$30,000,000 with the construction portion of this project to be
completed by September, 1999. Funding for the project has not yet been
obtained but is expected prior to May, 1997. All DB firms/teams
responding will be evaluated during Phase One on the following criteria
in relative order of importance: (1) Specialized experience and
technical competence of the DB firm/team with emphasis on highway
design and construction projects. (2) Past performance of the DB
firm/team in terms of quality, cost control, and timeliness on similar
projects (including the architect-engineer and construction members).
(3) Technical and managerial approach including general project
delivery plan, project delivery philosophy, QA/QC plan, organizational
chart, construction scheduling, etc. (but not detailed design or
technical information). (4) Capability to perform design and
construction of highways, including financial and bonding capacity. No
fewer than three or greater than five of the most highly qualified DB
firms/teams will be short listed to participate in Phase Two of this
Design Build Selection Process. In Phase Two, those firms/teams
shortlisted will be sent a Request for Proposal (RFP) which will
outline the remainder of the process requirements. The RFP will provide
approximately 30% highway design plans. The RFP will contain design
criteria from which the DB firm/team will complete the design process
to a point where a firm fixed price can be submitted in Phase Two.
Those firms will be required to provide the necessary information to
the Contracting Officer within 45 days after receiving the RFP. It is
envisioned that within the first 21 days of this period, a site
visit/pre-proposal conference will be held to provide additional
instruction and information. An opportunity will be provided for field
geotechnical investigation. Upon receipt of the technical and cost
proposals, the Evaluation Board will review the technical proposals and
evaluate them based on evaluation factors and subfactors as outlined in
the RFP. The RFP evaluation factors will include cost, technical and
managerial criteria and project completion time. Once the technical
evaluation has been completed, the cost proposals will be reviewed and
analyzed. If no technical or cost issues are in need of
clarifications, the Evaluation Board will conduct a "best value"
analysis and submit their recommendations to the Chief of Contracting
Office for approval. Award of one Firm Fixed Price contract is
anticipated by July 30, 1997. Debriefings will be made available after
contract award. Design-Build Firms/Teams which meet the requirements
listed in this announcement are invited to submit six copies of the
completed SF 254 and 255, U.S. Government Architect- Engineer
Qualifications, to the office indicated above for Phase One evaluation.
The SF254 and 255 are formatted for Architect-Engineer and Related
Services. The construction element of the firm/team shall also be
addressed on the SF 254 and 255. Only responses received by 3:30 p.m.
local time on April 29, 1997 will be evaluated further. Interested
teams may obtain SF 254 and 255 forms from the Government Printing
Office. This proposed contract is being solicited on an unrestricted
basis. Interested firms are requested to include telefax numbers, the
Contractor Establishment Code (CEC), and Taxpayer Identification Number
(TIN) on the SF 255 and SF 254 in Blocks 3a and 1, respectively. In
Block 10, state why your firm is specially qualified based on the
evaluation criteria. Also, use Block 10 to provide additional
information desired by your firm. Limit the size of Block 10 to 30
pages. Experiences identified in Block 8 should not be more than 5
years old. The DB firm's/team's primary person proposed to be the
direct contact with CFLHD's office throughout the contract work should
be identified as the "Project Manager". The selected firm may be
subject to an advisory audit performed by the Defense Contract Audit
Agency. Because this contract acquisition could result in an award over
$1,000,000, a subcontracting plan will be required by the selected
firm, if the firm is a large business concern. The SIC Code is 1611.
The small disadvantaged business set-aside goals in their
subcontracting plan shall not be less than 10 percent of the
subcontracted work. This does not apply if the prime firm is a small
business concern. This is not a request for proposal and no
solicitation package is available. (0076) Loren Data Corp. http://www.ld.com (SYN# 0117 19970319\Y-0018.SOL)
Y - Construction of Structures and Facilities Index Page
|
|