|
COMMERCE BUSINESS DAILY ISSUE OF MARCH 24,1997 PSA#1808U.S. Army Engineer District, San Francisco, COE, Attn: CESPN-CT, 333
Market Street, Room 704, San Francisco, CA 94105-2197 C -- PROFESSIONAL SURVEYING, MAPPING AND PHOTOGRAMMETRIC SERVICES IN
SUPPORT OF VARIOUS CIVIL WORKS PROJECTS FOR THE SAN FRANCISCO DISTRICT
SOL DACW07-97-R-0006 DUE 042497 POC Marcus Tikotsky, Contract
Specialist, (415) 977-8509 Indefinite Delivery Order Contract for
professional surveys of construction and planning projects located
within the San Francisco District Corps of Engineers jurisdictional
boundaries which include San Francisco north to the Oregon border and
south to San Luis Obispo. Services shall include all types of land
surveys, hydro surveys, photogrammetry, mapping and plotting of survey
results, computation of earthwork quantities, and other related survey
services. All hydrographic survey work shall be performed to Class I
specific standards in Corps of Engineers Hydrographic Survey Manual, EM
1110-2-1003. Officers and crew must have a current, valid USCG license
or correctly endorsed document as required by the USCG. All vessel(s)
must comply with all U.S. Coast Guard safety regulations and be able
to operate in restricted maneuvering areas, rivers, open bay waters and
offshore entrance channels. The principal of the firm and all party
chiefs must be licensed surveyors or civil engineers licensed to
practicesurveying in the State of California. The Contractor shall be
responsible for accomplishing surveys and preparing drawings using
computer-aided design and drafting (CADD) and delivering the drawings
in (1) Autodesk AutoCAD CADD software, release 13 (and/or higher),
MS-DOS/Windows, and/or (2) Intergraph MicroStation NT software, release
5.0 (or Microstation 95), Windows NT, version 3.51 (or higher),
electronic digital format. The Government will only accept the final
product for full operation, without conversion or reformatting, in the
target CADD software format, and on the target platform specified
herein. The target platform is a 586-pentium-133 workstation with a
MS-DOS/Windows, version 6.22/NT 3.51 or 95 for AutoCAD, a TD 30
workstation with a Windows NT, version 3.51 operating system for
Intergraph. The applicable SF 254 experience profile code is l02. Item
4 of Form 255 shall indicate personnel strength of the principal firm
at the office where work is to be accomplished. Additional personnel
strength, including consultants, may be indicated parenthetically. In
order to be considered for selection, you must note in Block l0 of the
SF 255 all DOD contracts awarded to your firm and all affiliates (do
not include consultants) during the last l2 months along with the
dollar amount of the awards and the total amount awarded. This
announcement is open to all businesses regardless of size. If a large
business is selected for this contract, it must comply with FAR
52.219-9 regarding the requirement for a subcontracting plan on that
part of the work it intends to subcontract. The plan is not required
with this submittal. The A-E Selection Board will use a numercial
scoring system to establish maximum scores for each firm on each of the
six evaluation criteria stated in relative order of importance in Note
24. Criteria 1 thru 5 are primary. Criteria 6 thru 8 are secondary and
will only be used as "tie-breakers" among technically equal firms. In
addition to the six evaluation criteria, the following sub-criteria
(which are all equal) shall be evaluated. 1. Professional
Qualifications: The evaluation will consider education, and overall and
relevant experience. 2. Specialized Experience: The evaluation will
consider the following: (a) Documented experience in land and hydro
surveying utilizing state-of-the-art automated equipment and methods
such as differential GPS, photogrammetry, and digital terrain models.
(b) Automated hydrographic survey systems to include as a minimum
computerized system interfaced with the following equipment: electronic
positioning equipment (x,y,z data collection in real-time);
digital/analog depth recorder; hull mounted, dual frequency (28 khz and
200 khz), 4 degree or less beam width, transducer(s); on-board plotter;
automatic tide gage update display; and line track indicator.
Navigation software capable of plotting vessel location once each
second, record 10 soundings per second, process the hydrographic data
in "real-time", review cross sections immediately after completing each
survey line, and update tide readings; post plot software capable of
accurately editing field survey data and producing quality plan plots,
cross section plots and reliable volume quantity computations.
Differential Global Positioning System (DGPS) to be used as the primary
navigation system, capable of achieving Class 1 (sub-meter) accuracy
with conventional (meter level accuracy) laser range-azimuth and
range-range systems to be available as backup, secondary positioning
systems. The location of boats with this equipment relative to San
Francisco District geographical boundaries as further defined in
criteria No. 5 below will also be considered as part of subcriteria
(b). (c) prior team experience with significant sub-contractors. 3.
Capacity to Accomplish the Work in the Required Time: The evaluation
will consider total vessels, equipment and personnel strength of key
disciplines for the proposed team including subcontractors and
consultants in relation to the firm's projected workload for the
contract period of performance. 4. Past Performance. Past performance
on DOD and other contracts with respect to cost control, quality of
work, and compliance with performance schedules. Also past performance
on previous sub-contracting plans (offerors must provide performance
data on previous subcontracting plans for evaluation purposes.) 5.
Knowledge of Locality: The evaluation will consider the firm's
knowledge of wind, wave conditions, tidal currents in the San Francisco
District's geographic boundary through experience in the geographic
boundary which extends from the Oregon border south to San Luis Obispo
and east to the Sacramento/San Joaquin valleys. 6. Extent of
participation of SB, SDB, historically black colleges and universities,
and minority institutions in the proposed contract team, measured as a
percentage of the total estimated effort. 7. Volume of DOD contract
awards the last 12 months as described in Note 24. 8. Geographic
Location -- Location of the essential staff for this project (or a
commitment to locate) in the general geographical area of the projects.
Firms desiring consideration must submit SF 254 (if not already on
file), and a SF 255 within 30 calendar days from the date of this
notice. An indefinite delivery order contract is expected to be awarded
for a l2 month period starting on or about 97 Aug 20. Cumulative total
for all task orders will not exceed $500,000.00 for the term of the
contract and each task order shall not exceed the annual contract
amount. This contract may be renewed for two additional year periods
with additional ceilings of not to exceed $500,000.00. If contract
amount for base year period or preceding option period has been
exhausted or nearly exhausted, an option can be exercised prior to
expiration of contract period. This is one of two surveying contracts
-- criteria to be used in allocating orders among the contracts is a
sixty-forty split. At the time a specific requirement becomes known, a
scope of work will be provided to the Contractor and a final price for
the particular work may be negotiated in accordance with the contract
terms. Further information may be obtained by contacting Keiso Morimoto
at (4l5) 977-8569. Firms desiring consideration shall submit
appropriate data as described in numbered Note 24. This is not a
request for proposal. (0079) Loren Data Corp. http://www.ld.com (SYN# 0013 19970324\C-0002.SOL)
C - Architect and Engineering Services - Construction Index Page
|
|