COMMERCE BUSINESS DAILY ISSUE OF MARCH 31,1997 PSA#1813National Park Service, Shenandoah National Park, 3655 US HWY 211 E,
Luray, VA 22835 Y -- REMOVAL AND DISPOSAL OF UNDERGROUND FUEL STORAGE TANKS AND
INSTALLATION OF REPLACEMENT ABOVE GROUND STORAGE TANKS SOL IFB SNP-7-1
DUE 042597 POC Cornelia E. Printz, (540) 999-3573, Contract
Specialist. Provide all necessary material, equipment and labor for the
excavation, removal and disposal of existing underground fuel tanks and
the installation of replacement ConVault tanks and concrete pads. Tanks
are provided by the Park and will be delivered by the manufacturer to
various locations. Contractor is responsible for off-loading tanks from
the delivery truck. Remove all existing piping and replace with new
piping, including all generator equipment connections. Replace all fuel
oil system controls and day tanks. Reconstruct lawn area, place topsoil
seed and mulch at backfilled locations. Work located at Skyland
Developed Area, Milepost 42, Skyline Drive Wastewater Treatment Plant,
Shenandoah National Park. (0086) Loren Data Corp. http://www.ld.com (SYN# 0119 19970331\Y-0010.SOL)
Y - Construction of Structures and Facilities Index Page
|
|