Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF APRIL 7,1997 PSA#1818

Panama Canal Commission, Construction Division, Unit 2300, APO MIAMI, FL 34011-5000

S -- REPLACEMENT OF PRIMARY SUPERHEATERS AND FURNACE FLOOR TUBES SOL CD-97-28 DUE 051997 POC Point of Contact -- Lina Boza, Contract Specialist, (507) 272-4241, Ramon M. Fernandez, Contracting Officer, (507) 272-7205 The Panama Canal Commission intends to acquire the services to furnish and deliver the pendant primary superheater tubes, a complete roof tube panel; 32 generator bank fined tubes; six side water wall tubes; upper and lower drum seal plates, scallop bars, sidewall insulation, tile in the generator bank area, and lagging for Boiler No. 3. A complete floor tube panel and hoppers from the mud drum to the front wall; a complete side water wall; one complete roof tube panel; a complete rear wall panel, the rear wall to floor refractory seal material for Boiler No. 4. Additionally, the Contractor shall provide the services of a field supervisor, welders (qualified for high pressure welding) and X-Ray technician to supervise and support during the installation of some of the parts to Boiler No. 3 and 4. Delivery of parts and completion of performance for Boiler No. 3 shall not exceed October 15, 1997 and for Bolier No. 4 shall not exceed December 15, 1997, Miraflores, Republic of Panama. When requesting information please state name, address, telephone, facsimile numbers and title of announcement. Requests for information or information will be accepted by facsimile at 011-507-272-7012 or Telex 3034 PCCAMRM PG. All responsible sources shall be considered by the Commission. See Note 12. (0093)

Loren Data Corp. http://www.ld.com (SYN# 0117 19970407\S-0003.SOL)


S - Utilities and Housekeeping Services Index Page