Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF APRIL 8,1997 PSA#1819

SOUTHWESTNAVFACENGCOM (Code 531), 1220 Pacific Highway, San Diego, CA 92132-5187

Y -- MCON (P-527B) SEWAGE TREATMENT PLANT MODIFICATIONS, SANTA MARGARITA AREA, SAN ONOFRE/SAN MATEO AREAS AT MARINE CORPS BASE, CAMP PENDLETON, CALIFORNIA SOL N68711-94-B-1546 DUE 052797 POC For Plans and Specs info call 619-532-2082/Contracting Officer, Katherine G Luhmann, 619-532-2796/For Bid Results call 619-532-2355. DESCRIPTION OF WORK -- The work includes the furnishing of all labor, approved materials, and equipment and incidental related work required to complete the sewage effluent disposal for the Headquarters area, Santa Margarita area, and San Onofre/San Mateo areas at Camp Pendleton. Pipelines will collect effluent from on-Base sewer treatment plants 1, 2, 3, 8, 13 and pump the effluent to percolation ponds and to the City of Oceanside ocean outfall. The work in the Headquarters and Santa Margarita areas includes the following elements: (a) approximately 13,700 lf of 20-inch effluent pipeline, (b) approximately 22,400 lf of 16-inch efflueent pipeline, (c) approximately 17,800 lf of 12-inch effluent pipeline, (d) approximately 14,200 lf of 10-inch effluent pipeline, (e) approximately 10,700 lf of 8-inch effluent pipeline, (f) bore and jack operations under roads and railroads, (g) 5 effluent pump stations including wet wells, 3 motores and pumps each, masonry buildings, meters and telemetry, associated electrical equipment and modifications to an existing pump station, (h) 2 emergency generators, (i) approximately 21 acres of percolation, equalization, and emergency storage basins with diversion structures, access roads, associated piping and appurtenances, (j) apprximately 2,100 lf of horizontal directional drilling under the Santa Margarita river, and (k) approximately 1,100 lf of sliplining an existing 12 steel pipeline. The work in the San Onofre/San Mateo area includes the following elements: (a) approximately 6,800 lf of 6-inch effluent pipeline, and (b) 1 pump station with 2 motors and pumps, masonry pump building, and associated electrical equipment. The work occurring in the City of Oceanside includes the following elements: (a) approximately 12,900 lf of 16-inch effluent pipeline, (b) approximately 900 lf of 12-inch effluent pipeline mounted on the substructure of the Coast Highway bridge along with removal of an existing 10-inch pipeline and (c) hot tap connection to the City of Oceanside sewer outfall. On Base and off-Base work will include seasonal construction restrictions and traffic control plans. Environmentally sensitive areas will require biological coordination, monitoring and mitigation, pipeline corridor revegetation and environmental permitting. Coordination is required with the North County Transit District for construction adjacent to and crossing under the railroad and incidental related work complete and ready for use. -- There will only be one site visit to be held on 08 May 1997. The site visit is scheduled from 08:30 a.m. to 04:00 p.m. Contractor's scheduled to attend must meet Mr. White at the Resident Officer in Charge of Construction (ROICC) office, building 22101, Marine Corps Base, Camp Pendleton, California at 08:30 on 08 May 1997 to be escorted to the site. Reservations to attend the site visit must be received no later than seventy two (72) hours in advance by contacting Mike White at 619-760-8201 or faxing him at 619-760-8210. -- The estimated cost is between $5,000,000 and $10,000,000. -- Firm Fixed Price Contract. -- Contract duration is approximately 540 calendar days. -- Bids will be considered from all responsible sources. -- This project is unrestricted. -- The Standard Industrial Code is 1629 and the annual size standard is $17 million. It is recommended the subcontracting goals reflect a minimum goal of 5% for Small Disadvantaged Business Subcontracting effort. -- NOTE: Plans and specs will not be mailed to firms within a 20 mile radius of the issuing office. A fee will be charged for all plans and specs. Please call 619-532-2082 for the price of this project. -- Solicitation packages may be acquired in person from Plan Issue or by mail. -- Telephone requests will not be accepted. -- Requests for the solicitation package must be in writing stating solicitation number N68711-94-B-1546, complete name, address, area code and phone number and whether bidding as a prime/subcontractor/supplier. -Plan holders lists will not be faxed. -- Mail requests to Southwest Division, Naval Facilities Engineering Command (Plan Issue), Building 132, 1220 Pacific Highway, San Diego, CA 92132-5187. The only methods of payment that will be accepted for plans and specifications are Visa, Mastercard, cashiers checks or money orders and they should be made out to DEFENSE PRINTING SERVICE. -- Fees are not refundable. -- If you choose to pay by cashiers check or money order, please submit one (1) cashiers check or money order per project. -- Solicitation packages are limited to two (2) sets per prime and one (1) per subcontractor/supplier. -- Plans and specifications will be available on or about 25 April 1997. (0094)

Loren Data Corp. http://www.ld.com (SYN# 0118 19970408\Y-0022.SOL)


Y - Construction of Structures and Facilities Index Page