|
COMMERCE BUSINESS DAILY ISSUE OF APRIL 11,1997 PSA#1822DOC; Mountain Administrative Support Center; Acquisition Management
Division; 325 Broadway MC3; Boulder, CO 66 -- ELECTROSTATIC CHUCK SOL 52RANB70C027 POC Procurement
Technicians, (303) 497-3221 or Fax: (303) 497-3163 E-MAIL: NOAA; MASC
Acquisition Management, Joyce.J.Mills@noaa.gov. The National Institute
of Standards and Technology (NIST) requires a cooled wafer chuck
upgrade and preventative maintenance on an electron cyclotron resonance
plasma-enhanced chemical vapor deposition system (ECR System)
manufactured by PlasmaQuest, Inc.. A complete turnkey upgrade is
required, including all components, installation and computer
interfacing and programming necessary to integrate the cooled
electrostatic chuck with the existing ECR System. The ECR System is
used to deposit silicon dioxide on wafers (mostly silicon) for
microcircuit fabrication. In the absence of other qualified sources, it
is the intent of NIST to acquire this upgrade from PlasmaQuest, Inc.
850 North Dorothy Drive, Suite 504, Richardson, TX 75081, under "other
than full and open competition procedures," pursuant to 4l USC 253
(c)(1) -- only one responsible source. Minimum technical requirements
for the electrostatic chuck are as follows: (1) Shall be configured for
use with 76.20 mm silicon wafers that meet this standard: "SEMI M1.2-89
standard for 3 inch polished monocrystalline silicon wafers". (2) Shall
be able to control the temperature of the chuck between -15 deg. C to
120 deg. C using a chiller with a temperature range of -25 deg. C to
150 deg. C. (3) The thermal transfer medium between the chuck and wafer
shall be helium gas. (4) Clamping of the wafer to the chuck shall be
accomplished using an electrostatic force created by a tripolar
electrode configuration within the wafer chuck. (5) The transient time
required for the electrostatic chuck to completely grip a wafer shall
be adjustable from 0.3 seconds to 300 seconds. (6) The controller of
the electrostatic chuck shall be able to sense the conductivity of the
wafer during loading and communicate the conductivity to the ECR
System software. (7) The electrostatic chuck surface which contacts the
wafer shall be quartz. (8) The electrostatic chuck shall be able to
hold the wafer for more than 1.5 hours. (9) The electrostatic chuck
shall be able to release the wafer in less than 700 milliseconds. (10)
Shall be able to perform SiO2 depositions without using electrostatic
clamping and backside helium cooling. (11) The electrostatic chuck
operation shall be compatible with our existing deposition processes,
including rf bias up to 300 watts. (12) The chuck shall be capable of
withstanding backside helium arcs without damage. (13) The chuck shall
be capable of withstanding plasma exposure without damage. (14) RF
filters shall be provided for chuck and lift motor assembly. (15) Power
supply shall be capable of supplying bipolar output on each driving
line up to +/- 4000 volts. (15) Helium gas break for helium discharge
suppression shall operate at 10 Torr and 6 kV peak to peak rf voltage.
(16) Chuck shall be provided with an integral stepper motor lift
mechanism at rf potential. (17) Motor drive for wafer lift mechanism
shall be isolated from rf bias potential and integrated with
electrostatic state drive control signals. (18) The chuck shall have a
thermal conductivity of greater than 200 watts per meter squared per
Kelvin. Minimum technical requirements for installation/integration on
NIST ECR System are as follows: (1) Fully integrate electrostatic
chuck control into existing PlasmaQuest ECR control computer. (2) Shall
be able to control and monitor the pressure of the helium gas between
the wafer and chuck on existing PlasmaQuest ECR control computer. (3)
All required controllers, power supplies and interface electronics
shall be provided. (4) The wafer shall be loaded automatically onto the
chuck from the existing load lock. (5) The loading mechanism shall be
able to place a wafer in the center of the chuck with an error of
positioning no greater then +/- 0.5 mm. This tolerance includes the
positioning of the primary and secondary flats of the wafer to the
position of the respective flats on the chuck. (6) Existing PlasmaQuest
ECR control computer software shall be modified to control or monitor
all the appropriate parameters of the electrostatic chuck and be
completely debugged for problems. (7) Existing PlasmaQuest ECR control
computer software modifications shall include all appropriate control
characteristics of the electrostatic chuck so that they appear on the
same video screen as the existing process parameters. (8) The
contractor shall have expertise in process development for optimizing
SiO2 deposition processes for achieving conformal coverage in a
PlasmaQuest ECR system. (9) Initial setup and testing of the upgrade,
including the electrostatic chuck and software, shall be required at
the factory before installation at NIST. (10) The upgrade and all
warranty work shall be performed on-site with minimum downtime. (11)
The upgrade shall be completely operational and meet all the technical
requirements listed when the installation is complete. (12) A six
month warranty shall be required that includes all components, travel
and labor for the upgraded ECR System. This warranty shall require the
upgrade to be completely operational and meet all the technical
requirements for six months and cover all costs involved in meeting
these requirements including travel. (13) An ECR System preventative
maintenance shall be performed at the time of chuck installation which
includes the following: Load Lock: (a) Check lead screw drive and
lubricate; (b) Check bearings and belt on lead screw drive; (c) Check
drive unit on inside on load lock. Relubricate and check bearings; (d)
Check and clean or replace o-rings in load lock; (e) Check
micro-switches on load lock; (f) Change oil pad in turbo; (g) Clean
load lock (vacuum it and wipe it out). Clean down to turbo; (h) Check
setting on moducell; (i) Check cold cathode gauge. Clean if necessary.
Main Chamber: (a) Check quartz window and replace if necessary; (b)
Change top ISO 400 centering ring if necessary; (c) Check all viewports
and replace if necessary; (d) Clean out chamber, lower spool, valve and
turbo screen; (e) Check ceramic lift pins and replace if needed; (f)
Clean chuck and pucks; and (g) Check alignment of loading. System: (a)
Check for water leaks; (b) Check solenoid valves for leaks and proper
operation; (c) Check all drivers and sensors; (d) Check all analog
signals. Tweak signals where needed; (e) Check MFC'S for proper
operation; (f) Check interlock circuit; (g) Check water flow switch;
(h) Zero Baratrons and VAT pm5; (i) Clean or wipe down system; and (j)
Run plasma clean process. Sources responding must demonstrate their
capability to provide full system integration to meet the Government's
minimum requirements, and to provide preventative maintenance of the
ECR System at the time of chuck installation. This capability statement
shall be submitted to the individual and office cited above within 30
days from the publication date of this synopsis. The acquisition is a
commercial item acquisition. This is not a formal solicitation. See
Note 22. (0099) Loren Data Corp. http://www.ld.com (SYN# 0321 19970411\66-0015.SOL)
66 - Instruments and Laboratory Equipment Index Page
|
|