|
COMMERCE BUSINESS DAILY ISSUE OF APRIL 22,1997 PSA#1829DEPT OF JUSTICE, FED PRISON INDUSTRIES, 320 1ST STREET NW -- Material
Mgt Branch, WASHINGTON, DC 20534-0001 39 -- DYAMOMETER SOL 1PI-R-0696-97 DUE 030497 POC Contract Specialist,
MEALY, PATRICK, 202/508-3959 This synposis/solicitation is hereby
modified to extend reciept of offers indefinitely. This is a combined
synopsis/solicitation for commercial items prepared in accordance with
Part 12.6 and supplemented withadditional information as included in
this notice. This advertisement provides for the sole solicitation.
Unicor, Federal Prison Indistries, Inc. Beaumont, Tx is intending to
purchase 5 Dynomoniters immediately and an option to purchase 3 more
within two years of the initial purchase. Requests for Proposals or
written solicitations will not be issued. The proposal number is
1PI-R-0696-97. The proposal document and incorporated provisions and
clauses are those in effect through Federal Acquisition Circular 90-35.
The FPDS Product and Service code is 3799 and size 500. Offerors shall
submit a signed and dated offer to UNICOR, Material Management Branch
400 First Street NW Washington, DC 20534 ATTN: Bid Custodian, on or
before 2/11/97 at 2 PM. Offers may be submitted on a 1449 or letterhead
stationary. Offers must contain proposal number, time specified for
receipt of offeror, name, address and telephone number of bidder,
technical description of item being offered in sufficient detail to
evaluate compliance with the requirement under this proposal, terms and
condition of any expressed warranty, price and any discount terms,
remit to address if different if different from mailing address, a
completed copy of representations and certifications at FAR 52.212-3
and acknowledgment of all amendments. If a offer is not submitted on an
SF 1449 or company letter head, a statement specifying the extent of
agreement with all terms, conditions and provisions included in this
proposal. All offers that fail to furnish required representations and
certifications or information or reject the terms and conditions may
be excluded from consideration, offerors must hold prices firm for a
period of 30 days from specified date for receipt of proposal, unless
otherwise specified. Offers or modifications to proposals received at
the address specified for the receipt of offers after the exact time
specified will not be considered. Documents cited in the solicitation
may be obtained from the General Services Administration, Federal
Supply Service Bureau, Specifications Section, Suite 8100, 470 L'
EnFant Plaza, SW Washington, DC 20407, 202/755-0325/0326.The government
will award a contract resulting from this solicitation to the
responsible offeror whose offer is most advantageous to the government.
The following factors will be used to evaluate offers: Technical
Capability of the item offered to meet the governments requirement and
price. A written notice of award or acceptance of a bid mailed or
otherwise furnished to the successful offeror within the time for
acceptance specified in the proposal shall result in a binding contract
without further action by either party.Before a offer specified
expiration time, the government may accept a bid or part of a bid after
it's receipt unless a written notice of a withdrawal is received before
award. Dynamometer Statement of Work: The dynamometer must operate and
measure diesel engines from 1 to 1,000 net horsepowers. It must be
capable of performing and measuring at continuous speeds ranging from
300 RPMs minimum to 5000 RPMs maximum. It must be capable of operating
and measuring engines with a maximum torque of 15 lb/ft at 500 RPM
minimum to a maximum torques of 850 lb/ft at 3500 RPM maximum. It must
be capable of performing the following continuous test at minimum. (1)
Engine specified low idle for 30 minutes. (2) Engine specified high
idle for 30 minutes. (3) 25% of engine rated horsepower for 30 minutes.
(4) 50% of engine rated horsepower for 30 minutes. (5) 75% of engine
rated horsepower for 30 horsepower for 30 minutes. (6) 100% of engine
rated horsepower for one hour. Provide & Install engine cooling column
and water cooling lines. Install data acquisition system and wiring
harness with wiring protection. Fuel line connections and piping.
Provide return water collection tank with piping and pumps. Provide
exhaust ventilation to include muffling systems. Supply ventilation.
Engine flexible hose exhaust piping. GENERAL The vendor shall provide
a two year on-site warranty for all procured material, to include all
parts, labor and a transportation in connection with this contract.
This specification states the primary and ancillary equipment required
by the government, installation requirements and limitations.
EQUIPMENT SPECIFICATIONS Since there are more than 107 different
engines to be tested the vendor will price separately and make
available, all adapters and spacers needed to mount. The dynamometer
must be capable of being calibrated by the maintenance technicians who
operate it. The instrumentation system must be capable of being
calibrated by the maintenance technicians who operate it. The
instrumentation system must be capable of monitoring engine performance
or the probes, sensors, and input devices used for test. The
dynamometer must have a water brake absorber. The dynamometer must
operate at full load capability in both clockwise and counter clockwise
rotation. The dynamometer must have a strain gauge load cell. The
dynamometer must have an inductive speed sensor. The dynamometer must
operate within the water circulation of 40 gallons per minute at 35
pounds per square inch (psi) minimum, or higher if adjustable, with
atmosphere drain. The vendor shall provide six 5000 # rolling engine
test carts. The carts must have wheels for movement within the
maintenance facility and protect the tested engines to preclude
recalibration of the test equipment. The stands must allow the
technicians unrestricted access to the engine assembly to connect all
probes and sensors necessary for the dynamometer to perform all
required tests. Each dynamometer stand assembly will be equipped with
stand locking devices. Stands will be supplied with engine, drive
shaft, and locking shaft guard. Stands to cart configuration will
provide easy lock down and connections between drive shaft and engine.
The vendorshall provide a device that optimizes line and cable removal
from one test engine to attachment of another. The vendor shall provide
and install a swiveling boom device which channels all lines and cables
above the technicians' heads. The vendor shall mount the frame to the
wall. The device must extend a minimum of eight feet from the wall or
supporting base. The vendor shall provide all fittings, lines, mounting
hardware, probes, and thermocouples to mount on the engines. Lines and
hoses must extend 30 feet to ensure the system operates from a
junction box to the tested engine. The lines and hoses must have
positive lock connectors at both ends. Lines must withstand 250 degrees
Fahrenheit. The FPI requires transducers, thermocouples, and equipment
with the following minimum standards: 2 (ea.) fuel pressure
transducers (0-200 PSI); 2 (ea.) oil pressure transducers (0-200 PSI);
2 (ea.) air box pressure transducers (0-55 inches/mercury); 2 (ea.)
crankcase pressure transducers (0-10 inches/mercury); 2 (ea.) crankcase
pressure transducers (0-10 inches/water); 12 (ea.) thermocouples
(0-1000 degrees fahrenheit); and 1 set calibration weights (100
pounds). The vendor shall provide an instrumentation system which
monitors the sensors and probes attached to the dynamometer and tested
engine. It must control the technician's input parameters (e.g.
feedback intervals), and monitor outputs from the probes and sensors.
Engine and dynamometer controls will be such that it will either
manually or automatically control the test. Controls will be operated
by computer control with the assistance of the end user. The
dynamometer instrumentation will be equipped with an internal safety
system for emergency situation to prevent engine and dynamometer
damage. The following will be featured in equipment: A. In-cell warning
relay. B. Engine ignition switch and in-cell relay. C. Engine start
switch and in-cell relay. D. Three each accessory switch and in-cell
relays. A thermostatically controlled cooling column, for each
dynamometer shall be furnished for use with liquid cooled engines. The
heat dissipation rate shall be at least 1,320,000 BTU's per hour. An
adjustable thermostatic control valve shall be provided to obtain an
engine water outlet temperature of 160 degrees F to 200 degrees F. A
pressure relief valve shall be incorporated in the cooling system to
prevent abnormal cooling system pressure. A means shall be provided for
filling, venting and draining the cooling system. The cooling column
will be wall mounted and in such a way to be easily coupled to the
engine in test cell. Hoses and quick disconnects shall be provided to
connect the cooling column with the engines required to be tested. The
cooling column shall be equipped with sight glass and external
temperature gauge for water level and temperature readings. The fuel
flow measurement system shall conduct a fuel flow analysis by measuring
the volume of fuel being supplied to the engine. the unit shall work in
conjunction with the Data Acquisition System and function as a
measuring unit for measuring and calculating the amount of fuel flow to
engine. All fuel data shall be processed via standard "calculated
channel" in the computer, no special software package shall be required
to read, store, display or graph the data. The weather station shall be
designed to measure weather conditions inside the test cell. The three
conditions measured are barometric pressure, relative humidity and
ambient temperature. The unit shall be incorporated with the Data
Acquisition System to provide corrected horsepower when changes in
atmospheric temperature pressure, and humidity occur in the cell. This
shall be standard equipment and be installed in each test cell.
Instrumentation must provide the following minimum requirements. 31
channel analogue inputs analysis and graphics with all 31 channels. 14"
SVGA monitor, 16 MG-RAM 66 Mhz 486 CPU. High and low warning alarms
high and low emergency shutdown alarms. The vendor must provide all
software licenses required to operate the dynamometers. The program
must monitor probe and sensor output, provide an on screen display of
engine performance, print analytical information, and store historical
data on electronic media. The program must provide a "built-in-test"
capability to calibrate probes and sensors. The instrumentation system
currently in use monitors the probes, sensors, and input devices and
provides feedback to the operator for calibrating these items.
INSTALLATION The vendor shall install the new system within the
existing facilities. To include all necessary parts require to meet the
outlined specifications. The new dynamometer must operate independently
and not interfere with the operation of the existing system. These
modifications must be made to provide movement of the dynamometer with
the test cell. The system must not restrict other engine testing
capability. The vendor shall provide, two (2) sets of operation and
repair manuals which includes wiring schematics, repair part numbers,
troubleshooting guides, and maintenance repair procedures for the
entire system. The vendor shall provide start- up assistance, operator
instructions, and on-site training and assistance. Prior to
installation, the vendor should conduct an on-site inspection of the
facility. The successful vendor must provide company representatives
that meet the Bureau of Prisons policy to gain access to the
institution. Before entering the Prison, the company's representative
must be approved by the institution. (0108) Loren Data Corp. http://www.ld.com (SYN# 0223 19970422\39-0001.SOL)
39 - Materials Handling Equipment Index Page
|
|