COMMERCE BUSINESS DAILY ISSUE OF APRIL 22,1997 PSA#1829R -- ISO 9001 REGISTRATION SERVICES This is a request for industry
comment on the proposed Statement of Work for ISO 9001 Registration
Services for NASA. Interested parties are requested to review the
following and submit their comments within 7days of this posting.
Comments as to whether this SOW is in agreement with the Standard
Practices employed within the Industry are desired, as well as general
comments. NASA will consider comments submitted by the due date in
preparing the RFO for these services. The RFO will contain Fact Sheets
for each Center participating in this Consolidated Solicitation and
all other information necessary to submit a Firm Fixed Price Proposal
for the Registration Services. 1.1 ISO 9001 Registration Services: NASA
requires the contractor to perform all services necessary to conduct an
audit of NASA operations participating in this contract to determine
compliance of specified NASA operations with ANSI/ASQC Q9001, Quality
Systems Model for Quality Assurance in Design, Development Production,
Installation and Servicing. Scope of NASA operations and processes to
be certified are specified, on a center by center basis, in
Attachments included in Section J. Specific service components to be
performed at each site are as follows: 1.1.a. Management briefings
1.1.b Initial site visits 1.1.c. Quality Manual Audits 1.1.d.
Preliminary Assessment Audits 1.1.e. Formal Assessment for Registration
(Certification Audit) 1.1.f. Non-conformity remediation reviews 1.1.g.
Surveillance audits Specific details regarding each service component
are set forth below. The contractor is responsible for insuring that
they perform in accordance with those service components except for the
work describe as Prerequisite. The Prerequisite activities are the
responsibilities of the Government. The Contractor shall inform the
Contracting Officer if it can not continue with a service component due
to a failure on the part of the Government to perform Prerequisite
activities. 1.1.a. Management briefings Description of Work: Shall
conduct briefings tosenior management at each Center using this
contract. A management briefing shall be provided after contract award
and after each service component has been performed at each site to be
certified. Initial briefing shall include as a minimum: 1. Description
of the certification processes employed by the registrar 2.
Expectations the Registrar has of NASA staff and roles of NASA
management. Subsequent briefings shall include as a minimum: 1.
Findings from the completed activities 2. Identification of impediments
to certification 3. Identification of strengths and weaknesses
Documentation: Accurate summary of meeting findings and decisions shall
be provided to Center Director or designee no later than five (5)
working days after the conclusion of the meeting. 1.1.b Initial site
visits: Prerequisite: Center will submit draft Quality Manual and a ISO
9001 Implementation Plan to contractor 30 days prior to site visit.
Centers shall also prepare and provide names and locations of
appropriate center personnel and insure availability of these
individuals for initial site visits. Description of Work: Visit center
(all locations to be certified) to meet key personnel, to tour and
conduct a preliminary, top level review of center key processes (See
Center Fact sheets, Section J) Documentation: Documentation to be
furnished subsequent to completion of this milestone shall included as
a minimum: 1. Analysis of scope of ISO certification as detailed in
the Center ISO Implementation Plan. Ambiguities, conflicts with the
terms of this contract, conflicts with the ANSI/ASQC ISO 9001 standard,
and other significant issues should be included in this analysis. 2.
Analysis of draft quality manual detailing strengths and weaknesses.
1.1.c. Quality Manual Audits Prerequisite: Centers will submit final
quality manuals (along with supporting documentation) and system level
procedures for processes to be ISO 9001 certified. These materials
must be provided a minimum of thirty (30) days prior to start of this
milestone. Description of Work: Conduct a detailed audit of the quality
manuals and system level procedures for compliance with applicable
elements of the ISO 9001 standard. Documentation: Quality Manual Audit
shall address as a minimum 1. Strengths of the Quality Manual and
system level procedures 2. Significant weaknesses in the Quality Manual
and system level procedures 3. Minor weaknesses in the Quality Manual
and system level procedures Documentation shall be distributed
immediately following Management Briefing for this milestone. 1.1.d.
Preliminary Assessment Audits Description of Work: Conduct a
preliminary assessment audit to determine the organization s readiness
for the formal assessment. Documentation: Preliminary assessment audit
report shall, as a minimum, include the findings of the preliminary
assessment audit. This report shall be furnished to the Center no later
than the close of the Management Briefing (1.1.a) for this milestone.
1.1.e. Formal Assessment for Registration (Certification Audit)
Description of Work: Conduct the formal audit for certification of
Center processes for conformance with ANSI/ASQC Q9001, Quality Systems
Model for Quality Assurance in Design, Development Production,
Installation and Servicing Contractor shall provide one of the
following, along with associated rationale (strengths, major
non-conformities, minor non-conformities) along with corrective actions
required: 1. Approval 2. Conditional Approval 3. Disapproval In the
event of Conditional Approval or Disapproval, the Contractor shall
perform 1.1.f. Documentation: Formal assessment report, as a minimum,
shall include specifics of major and minor non-conformities. These
should be cross-referenced to the 21 elements in the aforementioned
ANSI/ASQC standard. Contractor shall also include corrective actions
and a proposed timeline for follow-up. Prepare and process registrar
materials as are required in order to document formal registration.
1.1.f. Non-conformity remediation reviews Description of Work: Review
resolution of non-conformities pending effective resolution . Reviews
shall be in accordance with ANSI/ASQC Q9001, Quality Systems Model for
Quality Assurance in Design, Development Production, Installation and
Servicing. Contractor shall provide one of the following, along with
associated rationale (strengths, major non-conformities, minor
non-conformities) along with corrective actions required: 1. Approval
2. Conditional Approval 3. Disapproval In the event of Conditional
Approval or Disapproval, the Contractor shall re-perform 1.1.f.
Documentation: Contractor shall document the success or failures of
Government to correct non-conformities documented in 1.1.e. Prepare and
process registrar materials as are required in order to document formal
registration 1.1.g. Surveillance audits Conduct post-certification
audits to validate continued compliance with ANSI/ASQC Q9001, Quality
Systems Model for Quality Assurance in Design, Development Production,
Installation and Servicing Documentation: Prepare and process
registrar materials as are requiredin order to document formal
registration 1.2 Performance Standard This is a Performance Based
Contract. The contractor will be considered to have achieved minimally
accepted performance when service components 1.1.a through 1.1.f have
been addressed at all locations for any given Center. Re-performance
of any given service component will required if the contractor has not
performed to the satisfaction of the Center director or a designee
specified by the Center director prior to 1.1.a. It is recognized that
in some cases 1.1.f. will not be required if Center operations are
certified as compliant after 1.1.e. (See section E for more PBC related
information). 2. Schedule . 1.1.a. Management briefings Initial
briefing 60 days after award; All other briefings within 5 days after
completion 1.1.b. Initial site visits 90 days after award 1.1.c.
Quality Manual Audits 30 days after Center submits final Quality Manual
and supporting documentation 1.1.d. Preliminary Assessment Audits TBD
(based on activities required under 1.1.c. Target is 4 months prior to
Formal Assessment for Registration (1.1.e) 1.1.e. Formal Assessment
for Registration (Certification Audit) Target date is 7/99 for
participating and option Code R and S centers. Target date is 7/98 for
Code M centers. 1.1.f. Non-conformity remediation reviews 60 days
after Management briefing of 1.1.e. 1.1.e. Surveillance audits Semi
annually for 3 years after certification date WEB: Click here for the
latest information about this notice,
http://procurement.nasa.gov/EPS/LeRC/date.html#9001. E-MAIL: Anita P.
Parasuram Raman, Anita.P.Raman@lerc.nasa.gov. Loren Data Corp. http://www.ld.com (SYN# 0447 19970422\SP-0014.MSC)
SP - Special Notices Index Page
|
|