COMMERCE BUSINESS DAILY ISSUE OF APRIL 24,1997 PSA#1831U. S. Army Corps of Engineers, Omaha District, 215 North 17th Street,
Omaha, NE 68102-4978 Y -- CHILD DEVELOPMENT CENTER, FORT CARSON, COLORADO SOL
DACA45-97-B-0030 DUE 061297 POC Contract Support Branch, 402/221-4266
WEB: Omaha District Contracting Division Homepage,
http://ebs.mro.usace.army.mil/EBS/CONTRACT.HTM. E-MAIL: Cathy Vanatta,
Cathy.L.Vanatta@mro01.usace.army.mil. On or about 12 May 1997, this
office will issue Invitation for Bids for the construction of CHILD
DEVELOPMENT CENTER, FORT CARSON, COLORADO. Bids will be opened on or
about 12 June 1997. This solicitation is unrestricted and open to both
large and small business participation. Contractors interested in
inspecting the site of the proposed work should contact the Fort Carson
Resident Engineer, U.S. Army Corps of Engineers, Bldg. 849 O'Connel
Blvd, Fort Carson, CO 80913, Telephone: (719) 526-5448. FAX (719)
526-5365. The work will include the following: (Approx. quantities)
2190 square meters single story building; asphalt shingle roof
supported by a metal deck; exterior walls of split-faced concrete
masonry veneer block with steel stud back-up; nine classroom modules
includes: three preschool modules, three toddler modules, two
infant/pre-toddler modules, and one multi-age module; support offices
and lounge for the staff, a kitchen, and a laundry; forced hot water
heating system consisting of boiler, circulating pump, water
distribution system, and associated space heating equipment; mechanical
cooling system consisting of chiller, circulating pump, water
distribution system, and associated space cooling equipment; wet pipe
fire protection sprinkler system; playground equipment (preschool,
toddler and infant); park equipment includes: pavilion, storage sheds,
planter boxes & benches; 293 meters FE-5 chainlink fence; trees,
shrubs and irrigation system; seeding and sodding; asphalt parking area
and access drive; new underground power distribution system; domestic
water service lines, fire protection water lines, and sanitary
wastewater collection; gas distribution service line; cathodic
protection. The estimated construction cost of this project is between
$2,500,000 and $5,000,000. Contractor's Quality Control will be a
requirement in this contract. The Contractor will be required to
commence work within 10 days after notice to proceed and complete the
work 365 calendar days after receipt of Notice toProceed. Provisions
will be included for liquidated damages in case of failure to complete
the work in the time allowed. Performance and payment bonds will be
required. The plans and specifications will be available on Compact
Disk (CD-ROM) and will be provided free of charge. It has been
determined that the number of Compact Disks be limited to one (1) per
firm. Plans and Specifications will not be provided in a printed hard
copy format. Contractors may view and/or download this project from the
Internet at the following Internet address:
http://ebs.mro.usace.army.mil/ebs/contract.htm Ordering of CD-ROM shall
be made through the Internet address above or requested by faxing this
page (with all information) to (402)221-4530. Questions regarding the
ordering of same and bidding matters should be made to: 402-221-4266.
Telephone calls regarding small business matters should be made to Mr.
Hubert J. Carter Jr. at 402-221-4110. Telephone calls on contents of
drawings and specifications should be made to Specification Section at:
(402) 221-4547. Question regarding accessing information from the
Internet should be made to (402) 221-4824. (0112) Loren Data Corp. http://www.ld.com (SYN# 0114 19970424\Y-0019.SOL)