Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF APRIL 30,1997 PSA#1835

Fluor Daniel Fernald, P.O. Box 538704, Cincinnati, Ohio 45253-8704

Y -- CONSTRUCTION SOL FSC593 DUE 051597 POC Alan Hohnhorst, (513) 648-5168. This is a readvertising of the Injection Demonstration Project previously advertised on March 18, 1997 and April 1, 1997. Fluor Daniel Fernald (FDF) is scheduled to release an Invitation for Bid (IFB) on or about June 1, 1997 for the Injection Demonstration, Southfield Extraction System, and South Plume Optimization Project at the Department of Energy's Fernald Environmental Management Project (FEMP) in Fernald, Hamilton County, Ohio. This project consists of the installation of approximately 19,000 feet of underground HDPE pipe, furnish and erect a 50,000 gallon water tank on concrete pad, furnish and installation of various pumps on concrete foundations, fencing, clearing and grubbing, approximately 5,000 feet of rough grading and gravel roadway, miscellaneous electrical and instrumentation, above ground piping, ten (10) well houses, and one (1) valve house. The subcontractor shall provide all personnel, supervision, facilities, equipment, material, supplies and services (except as may be expressly set forth in any subsequent subcontract) and otherwise do all things necessary for, or incident to, the performance of the work as set forth in the subcontract. The successful bidder will be required to comply with terms and conditions of the FEMP Site Project Labor Agreement for union construction labor forces. The subcontractor must be able and willing to perform at least 25% of the work (dollar value) with their own work forces. Additionally, the subcontractor must provide record of safe construction performance by a current workers compensation experience modification rate (EMR) of less than or equal to 1.05 or the trend for the past three years downward and none of the past three years has an EMR greater than 1.25. Lastly, the subcontractor must provide references of past experience involving the installation of underground HDPE pipe, roadwork, building construction, pump installation, and electrical and instrumentation work. The estimated cost of the project is $3,500,000.00 to $5,000,000.00. Bid guarantee required. Interested firms should send a Letter of Interest with EMR rating and references referencing this announcement and including shipping address, primary contact, and telephone and fax numbers to the attention of A.J. Hohnhorst at FDF, P.O. Box 538704, Mail Stop 44, Cincinnati, Ohio 45253-8704, (513) 648-5168, or FAX (513) 648-5234, no later than May 15, 1997. The exact bid date will be established by the IFB. (0118)

Loren Data Corp. http://www.ld.com (SYN# 0080 19970430\Y-0013.SOL)


Y - Construction of Structures and Facilities Index Page