COMMERCE BUSINESS DAILY ISSUE OF APRIL 30,1997 PSA#1835DA, Tulsa District, Corps of Engineers, PO Box 61, Attn: CESWT-CT,
Tulsa, OK 74121-0061 Y -- SOUTHERN TRIBUTARIES DETENTION SITES PHASE III, MINGO CREEK LOCAL
PROTECTION, TULSA, OKLAHOMA SOL DACW56-97-B-0024 DUE 062497 POC Diane
Cianci, Contract Specialist, 918/669-7270 Work consists of construction
of 2 flood detention sites in the Southern Tributaries portion of the
Mingo Creek watershed in Tulsa, Oklahoma. The work includes clearing
and grubbing; approximately 215,000 cubic yards of common and rock
excavation; construction of earthen berms; construction of a concrete
drop structure; extension of a box culvert; replacement of a box
culvert; construction of concrete access ramps and placement of asphalt
paving; construction of concrete trickle channels and low flow
channels; construction of drop inlets and headwalls; and relocation of
water, sanitary sewer, and storm sewer lines. Estimated cost range of
this project is $1,000,000 to $5,000,000. An advanced non-refundable
fee of $37 (reduced size) and $74 (full size) is required for each set
of specifications. Make check payable to F&A Officer, USAED, Tulsa and
mail to the attention of the Contracting Division. Payment must be
received prior to issuance of plans and specifications. Plans and
specifications will beavailable on or about May 23, 1997. No phone
calls to order please. All orders will be mailed via first class mail.
Request for special handling (Fed-X, etc.) will not be honored.
(0118) Loren Data Corp. http://www.ld.com (SYN# 0093 19970430\Y-0026.SOL)
Y - Construction of Structures and Facilities Index Page
|
|