Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF MAY 5,1997 PSA#1838

Wr-Alc/Pkoc, 215 Byron St, Robins Air Force Base Ga 31098-1611

C -- A/E SERVICES -- IDIQ SOL CECELT-R3-2097 POC For copy, POC IS C BROCK TURNER, 78 CEG/CECE,, 460 PERRY ST, ROBINS AFB GA 31098,, PHONE: 912-926-3533, EXT 121., For additional information contact Faye D Tant/Pkoea/912-926-2057 THIS SYNOPSIS SUPERCEDES CBD SYNOPSIS DATED 970422, REFERENCE: CECELT- R3-2097. PLEASE Disreguard the approximate issue/response date of 12 May 97 and the Anticipated Award date of 29 Aug 97. Project Number and Title: UHHZ 970804, Architect-Engineer Services -- Indefinite Quantity Contract, and Project UHHZ 970805,Architect-Engineer Services -- Indefinite Quantity Contract. b. Location: Robins AFB GA. c. Description: Work includes the production of designs, plans, drawings, estimates, and specifications for maintenance, repair, and minor construction projects. The Indefinite Delivery Contract will have a maximum of $750,000 in A-E fees, with a minimum of $5,000 guaranteed, against which individual delivery orders of up to $299,000 may be written. The contract period is for twelve months. The government may at its option renew the contract for an additional twelve months upon completion of the initial twelve month period. Typcial work includes, but is not limited to, the following: (1) new buildings and alterations and additions to existing buildings; (2) replace existing deteriorated roof systems with new roof systems; (3) construction, alteration, or repair of grounds roads, buildings, and structures; (4) alteration and repair of miscellaneous services and utlities; and (5) removal of asbestos materials. d. Factors on eligibility for consideration: (1) Geographical Area: Southeastern U.S. (2) Firm Size: Firms considered small businesses and large businesses will be eligible for consideration under this announcement. (3) Other: a. firms with Intergraph CADD capability and those with other CADD systems and inexpensive and accurate translators will receive special consideration. b. The overnment may at its option negotiate with the firm selected at a later date for services to inspect the project and provide as-built drawings. e. Estimated Start Date: 1 Sep 97. f. Estimated Award Cutoff Date: 1 Sep 98. g. Evaluation factors in approximate order of importance are as follows (with CADD and specificationson work processing weighing heavily on factors 1,2, and 4): (1) Specialized Experience; (2) Professional Qualifications; (3) Professional Capacity; (4) Past Performance; (5) Location; (6) Volume of work of DOD. h. In order to be evaluated, the firms must submit the total dollars awarded to the A-E by the DOD during the past 12 months, or past A-E fiscal year. i. Firms desiring consideration will submit SF 254 & SF 255 and appropriated data as described in Note 2 herein to C. Brock Turner, 78 CEG/CECE, 775 Macon Street, Robins AFB, GA 31098-2207. Special mail delivery such as Fed Ex or UPS should be sent to the project manager at B/280, 505 Page Road, Robins AFB GA 31098. Responses received by 30 days from the date of this issue will be considered for selection. This is not a request for proposal. PLEASE DO NOT CONTACT FAYE TANT (0121)

Loren Data Corp. http://www.ld.com (SYN# 0015 19970505\C-0007.SOL)


C - Architect and Engineering Services - Construction Index Page