COMMERCE BUSINESS DAILY ISSUE OF MAY 5,1997 PSA#1838EFA Chesapeake, Washington Navy Yard, Building 212, 901 M Street, S.E.,
Washington, DC 20374-5018 Y -- NAVAL SEA SYSTEMS COMMAND (NAVSEA) HEADQUARTERS, WASHINGTON NAVY
YARD, WASHINGTON, D.C. SOL N62477-94-R-0024 DUE 071497 POC Debbie San
Luis, Contracting Officer, (202) 685-3154, (fax 202-433-6900) WEB: EFA
Chesapeake Homepage, http://www.efdlant.navfac.navy.mil/efaches.htm.
E-MAIL: Debbie San Luis, Contracting Officer,
ddsan_luis@efa.ches.navfac.navy.mil. SOLICITATION NOTICE: THIS PROJECT
IS UNRESTRICTED. DESIGN/BUILD. This project includes design,
documentation and construction of office and support space in existing
Bldgs 104, 116, 197, and new Bldg 201, and parking deck. The project
requires demolition of existing buildings, renovation of existing
buildings, addiion to existing buildings, new construction, waterfront
development and site infrastructure. Bldg 104 will be renovated to
provide approximately 12,600 sm on four levels. Bldg 197 will be
renovated and expanded to the east to provide a total of approx. 59,500
sm on six levels, including mechanical penthouse level. A new 5-level
bldg 201 will be constructed on the site of existing bldgs 142, 198,
and 201 and provide approx. 16,900 sm of office space. Bldg 116 and
adjacent service yard will be modified to accommodate central
mechanical equipment and support services for the project. An 8-level
parking deck, (min 1,518) parking spaces) including 1-level below
grade, will be constructed on the site of existing bldgs 28 and 143.
The contractor is to provide all design documentation including civil,
landscape, architectural, structural, mechanical, plumbing,
electrical, and fire protection engineering required to complete
construction of this project. This is a REQUEST FOR PROPOSAL (RFP). A
past performance proposal, technical proposal and cost proposal are
required. The Past Performance Proposal is due 45 days from issue date
of the solicitation, with technical and cost proposals due 60 days
after the issuance date. TECHNICAL AND PAST PERFORMANCE ARE CONSIDERED
EQUAL TO PRICE. Technical Evaluation Criteria are: Work Plan, Relevant
Experience, Staffing, Contract Administration, & Management of
Subcontracting Opportunities. ESTIMATED COST RANGE IS OVER $75M. The
cost of plans/specs/video is $500 (non-refundable). The estimated date
plans/specs will be available is 15 MAY 1997. Plans/Specs are on a
first come first serve basis. Checks can be made out to EFA
Chesapeake/U.S. Treasurer. (0121) Loren Data Corp. http://www.ld.com (SYN# 0107 19970505\Y-0011.SOL)
Y - Construction of Structures and Facilities Index Page
|
|