COMMERCE BUSINESS DAILY ISSUE OF MAY 6,1997 PSA#1839Federal Aviation Administration, Acquisition Management, ACE-55, 601 E
12th Street, Kansas City, MO 64106 Y -- ESTABLISHMENT OF A QUALIFIED VENDOR LIST (QVL), CONSTRUCTION
PROJECTS #1, CENTRAL REGION. REQUEST FOR SCREENING INFORMATION REQUEST
(SIR) DUE 051997 POC Susan Chasteen, fax (816-426-3694) or internet
(susan.chasteen@faa.dot.gov.) or by mail. E-MAIL: Federal Aviation
Administration, susan.chasteen@faa.dot.gov.) or by mail.. The Federal
Aviation Administration (FAA), Central Region, plans to establish a QVL
of Prime Contractors that may be used for the following types of
recurring construction projects: REIL, VASI, PAPI, RVR, NDB, DME, GS,
LOC, MALSR, ALSF-2, ILS, LLWAS, E/G, Markers, Electrical, Cable Loop,
Site Restoration/Demolition and Facility Restoration. Contractors
placed on the QVL will be expected to perform at least 15% of the
on-site physical work and they will be required to perform work in all
four states covered by the Central Region (Iowa, Nebraska, Kansas and
Missouri). To be considered for the QVL a firm must be able to perform
all of the following types of work through normal business practices:
Clear, grub, grade, excavate and ill project site for new facility.
Furnish competent surveying resources to properly layout the subject
site and provide and vertical control. Install crushed rock access
roads, concrete access roads and surfaced facility plots to the grades
and elevations indicated. Work includesinstallation of geotextile
membranes and soil sterilants. Install reinforced concrete foundations
and footings for equipment shelters or buildings, transformers,
electrical equipment, LIR poles, elevated steel, manholes and
handholes, etc. as shown per contract drawings. Work includes
embedments and knockouts. Install individual spread footings, pier
footings, grade tie beams, etc. for the various types of foundations.
Install earth electrode grounding system, building grounding, and
lightning protection systems complete with material and hardware. Work
includes interconnections to a shelter or building grounding system.
Install all required cable ladders, cable trays, wireways, conduits,
fitting, motors, transformer, lights, receptacles, miscellaneous
electrical equipment, etc. as required. Trench and install underground
or exposed power, control, signal and fiber optic cables. Work
includes boring under taxiways, splices, handholes, manholes and
termination's. Install government furnished materials and ensure the
equipment and materials are interconnected in a proper working order.
Complete all caulking and sealing of equipment, buildings, wall
penetrations, etc. in order to make watertight and weatherproof.
Install and maintain erosion control measures to protect ditches,
inlets and facility plot layouts. Provide obstruction marking as
required to meet FAA and the local Airport Authority requirements.
Furnish temporary utility connections which may include electrical,
water, and gas. Establish and maintain safety plan work within the
airport operations areas. Implement and maintain a quility control plan
to ensure contract compliance. Conduct all required tests and checks to
verify contract compliance. Restore all site conditions to original
conditions when required. (0122) Loren Data Corp. http://www.ld.com (SYN# 0083 19970506\Y-0001.SOL)
Y - Construction of Structures and Facilities Index Page
|
|