SOUTHWESTNAVFACENGCOM, Camp Pendleton AFT, Code 531, 1220 Pacific Highway, Building 127, San Diego, CA 92132-5187

Z -- REPAIR/REPLACE ROOFS AND PIPING, MARINE CORPS MOUNTAIN WARFARE TRAINING CENTER (MCMWTC), BRIDGEPORT, CALIFORNIA SOL N68711-97-B-8311 DUE 070997 POC Dave Jackson/Contract Specialist, (619) 532-2338, Katherine Luhmann/Contracting Officer, (619) 532-2796. PRESOLICITATION NOTICE -- The work includes Part A: PE9728M -- BOQ's/BEQ's and Part B: PE9731M -- Dining Halls. The work for both parts includes the furnishing of all labor, approved materials, and equipment and incidental related work required to complete the addition of new metal sloped roofs over the existing flat roofs and the replacement of equipment to each building boiler room with any additional incidental related work. The BOQ's/BEQ's new roof addition will incorporate standing seam metal roofs with underlayment over 6-inch x 16 ga. steel decking supported by 6-inch x 16 ga. metal stud walls. Existing vents and flues shall be extended and flashed for sloped metal roofs. New gable and walls shall be constructed of 6-inch x 16 ga. metal sutds with 4-inch E.F.I.S with a secondary weather barrier over 1/2-inch water resistant gypsum wallboard. Remove existing roof hatch panels and replace panel with a removal E.F.I.S. lay-in panel. Provide insulation of walls. Flashing and metal louver vents shall match existing building base colors. The repair and replacement of equipment at the BOQ's and BEQ's boiler rooms shall relate to domestic hot water and heating systems for the buildings. All piping and electrical work to support domestic hot water system modifications. Included is the addition of concrete equipment pads and reinforcement of supports. The Dining Hall Facility roof addition will also be that of a standing seam roof over steel decking supported by metal stud walls. At new vertical walls, flashing and wall finishes from existing roof structure are to match existing. At the existing north roof, a removable roof panel section is to be constructed. The existing stnading seam roof is rolled to the side and then rolled back into place. All electronic roof top devices are to relocate to top of the new roof. The repair and replacement of equipment at the Dining Hall boiler room shall be the domestic storage tanks, boilers and piping assoicated with the equipment. The removal of the two 5.5 foot x 12-foot storage tanks shall be through the removable section of roof by means of a crane. Included is the addition of concrete equipment pads and reinforcements to supports. -- The estimated cost is between $1,000,000 and $5,000,000. -- Firm Fixed Price Contract. -- Contract duration is approximately 180 calendar days. -- This proposed contract will be unrestricted. -- The Standard Industrial Code is 1761 and the annual size standard is $7 million. It is recommended the subcontracting goals reflect a minimum goal of 5% for Small Disadvantaged Business Subcontracting Effort. Bidders should request in writing stating IFB number N68711-97-B-8311, with complete name, address, area code and phone number and whether bidding as a prime/subcontractor/supplier. -- Telephone requests will not be accepted. -- There will be a charge for plans and specs that is yet to be determined. The fee will be non-refundable. -- The only methods of payment that will be accepted for plans and specifications are Visa, Mastercard, cashiers cehcks or money orders and they should be made out to DEFENSE PRINTING SERVICE. -- Mail requests to Southwest Division, Naval Facilities Engineering Command (Plan Issue), 1220 Pacific Highway, Building 132, San Diego, CA 92132-5187. -- Fax requests will be accepted but, WILL NOT be processed until your method of payment has been received by this office. -- Solicitation packages are limited to two (2) sets per prime and one (1) set per subcontractor/suppliers. -- Bidders responding under this advertisement will not be required to resubmit request once formally advertised. -- Tentative issue date is on or about 9 June 1997 with an opening date of approximately 30 days later (NOTE: BOD stated above is TENTATIVE). -- Responses are due no later than 15 calendar days after publication of the advertisement in the CBD. (0122)

Loren Data Corp. http://www.ld.com (SYN# 0116 19970506\Z-0033.SOL)


Z - Maintenance, Repair or Alteration of Real Property Index Page