COMMERCE BUSINESS DAILY ISSUE OF MAY 9,1997 PSA#1842Department of Army, New England Division, Corps of Engineers, 424
Trapelo Road, Waltham, Massachusetts 02254-9149 Z -- REPLACE TILE TIDE GAUGES AND REPAIR CONCRETE, STAMFORD HURRICANE
BARRIER, STAMFORD, CT SOL DACW33-97-Q-0082 DUE 062597 POC Norman
Krause, 617-647-8833 E-MAIL: Contracting,
Norman.A.Krause@USACE.ARMY.Mil. The work consists of removing two tile
tidal gauges, repairing deteriorated concrete under and adjacent to
the gauge areas, furnishing and installing two fiberglass tide gauges,
removing a tile tide gauge at the harbor side retaining wall and
repairing deteriorated concrete in this area. Estimated cost of work is
between $25,000.00 and $100,000.00. Work shall be completed within 60
calendar days. Specifications available on or about 052897 at $10.00
per set. All responsible sources may submit a quote which will be
considered by the New England Division. (0127) Loren Data Corp. http://www.ld.com (SYN# 0062 19970509\Z-0007.SOL)