COMMERCE BUSINESS DAILY ISSUE OF MAY 16,1997 PSA#1847U.S. Department Of Agriculture, Agricultural Research Service, FD, 6303
Ivy Lane, Room 616, Greenbelt, Maryland 20770-1433 Y -- CONSTRUCTION, CHILLER PLANT EXPANSION, PLUM ISLAND ANIMAL DISEASE
CENTER, GREENPORT, NEW YORK. SOL 8205-3K15-97 DUE 080597 POC David
Springer, Contracting Officer, 301-344-0263 Pre-Solicitation Notice.
The contractor shall provide all material, labor, equipment, and
supervision, etc., necessary for the following project: The Base Bid
will include the following elements: 1) a pre-engineered, single span,
rigid braced frame building addition measuring 51 by 30 feet; 2) a
centrifugal 375-ton water chiller; 3) an induced draft 375-ton cooling
tower; 4) a 2,400-volt, 600-amp fusible switchgear; 5) a Class I, Type
B, 480-volt, 3-phase, 4-wire, 60-hertz motor control center; and 6) all
required, necessary, and appurtenant demolition, site work,
connections, controls and monitors, piping, pumps, valves, electrical
conduit and wiring to produce a complete and operating chiller plant
addition. Option No. 1 will include: 1) an additional 375-ton chiller
and an associated 375-ton cooling tower; 2) a motor control center; 3)
an oil-filled, 5kV primary, 277/480V secondary, 500 kVa transformer;
and 4) all required chiller controls, piping, pumps, valves, electrical
conduit and wiringand painting for the second chiller. Option No. 2
will include: 1) the automatic temperature control field monitoring and
control system with communications between the new DDC units and the
existing Carrier "Chillervisor" system. The system will be an extension
of the existing Landis & Gyr Powers System; 2) central and remote
hardware, software, and interconnecting wire and conduit between the
new and existing system including connection via phone line to the
existing LGP system; 3) a supervisory control system and interface with
the existing Carrier system. The new control panel shall fully
communicate to the existing Carrier and LGP systems; translational
hardware and software will be provided. Option No. 3 will include the
removal of existing piping, the furnishing, installation, and painting
of marine water boxes on the two existing 500-ton Carrier chillers,
repiping devices, and returning the existing chiller system to
operational status. The total Estimated Cost of Construction (ECC) for
this project is between $500,000 and $1,000,000. Time for completion
of the work will be 180 calendar days from the date of issuance of
Notice to Proceed. A pre-bid meeting is tentatively scheduled for July
16, 1997, at Plum Island. Requests for sets of plans and
specifications will be available to bidders at no cost. The request
MUST BE SENT to STV, Incorporated, 205 West Welsh Drive, Douglassville,
Pennsylvania 19518, Attention: Robert Kondrath. Supply is limited and
will be made on a first come, first serve basis. TELEPHONE OR FACSIMILE
REQUESTS FOR THE SOLICITATION PACKAGE WILL NOT BE ACCEPTED. The
solicitation is scheduled to be release o/a Jun 30, 1997, with bid
opening o/a August 5, 1997. (Reference Solicitation No. 8205-3K15-97).
</PRESOL> (0132) Loren Data Corp. http://www.ld.com (SYN# 0154 19970516\Y-0007.SOL)
Y - Construction of Structures and Facilities Index Page
|
|