COMMERCE BUSINESS DAILY ISSUE OF MAY 21,1997 PSA#1850U.S.Department of Energy, Document Control Specialist, 1000
Independence Avenue, SW, Washington, DC 20585-1615 A -- RADIOISOTOPE THERMOELECTRIC GENERATOR DEVELOPMENT, REFURBISHMENT
SUPPORT AND FABRICATION POC Irie Clarke, Contract Specialist, (202)
426-0079 Richard Lewis, Contracting Officer, (202) 426-0066.
RADIOISOTOPE THERMOELECTRIC GENERATOR DEVELOPMENT, REFURBISHMENT
SUPPORT AND FABRICATION DUE 15 DAYS AFTER PUBLICATION, POC Ms Irie
Clarke, Contract Specialist (202) 426-0079, Richard Lewis, Contracting
Officer, (202) 426-0066 The U.S. Department of Energy (DOE),
Headquarters is seeking sources to obtain contractual services for the
following: (a) support field operations on High Performance Generator
Radioisotope Thermoelectric Generators (HPG MOD-3 RTG) with nominal
power (BOL) output of 180 WATTS (e), (b) refurbishment and
regassing/safety inspection of HPG MOD-3 RTGs, (c) fabricate and
deliver miscellaneous refurbishment spare parts, (d) technical liaison
and Integration studies for use of the RTGs, (e) thermoelectric module
and RTG component development and testing, and (f) management and
engineering liaison and field-operations support, (g) design of RTGs
(including heat source) and construction of thermoelectric converters
for use in RTGs including required testing and DOE lab support, (h)
writing a Nuclear Safety Analysis Report and performing supporting
analysis for item "g" above, (i) design and construction of Ground
Support Equipment for item "g" above. The following specifications and
qualifications pertain to the proposed work -- The performance of the
tasks in the Statement of Work requires that the contractor have
several program and engineering personnel with DOE ~Q~ secret and
special DOD security clearances in order to interface with Department
of Defense (DOD) operating agencies and contractors and have access to
classified information. DOD controls program clearances and access on
an individual and a case-by-case basis. Interested firms must be able
to provide the DOD with the assistance they require for normal mission
operations (e.g., system studies, RTG performance predictions, handling
and integration requirements, safety, etc.), and also be able to
respond to emergencies that could jeopardize the mission, RTG or cause
a radiological hazard -- Contractor must have available resources to
perform tasks in (a) through (i) above -- Contractor must have
qualified personnel resources available to perform data measurement,
interpretation, and analyses of predicted RTG extended life,
performance and application -- Contractor must have knowledge and
experience in the design, characteristics, and functional application
of terrestrial RTGs in the 5 to 180 Watt(e) power range -- Contractor
must have fabricating facilities and experience to fabricate spare
components, instrumentation, tools, and equipment to support field
operations, as required -- Contractor must have an adequate Nuclear
Quality Assurance Program to support this effort -- Contractor must
have an adequate radiological program to support the program --
Contractor must have a DOE approved facility clearance to handle
classified documents up to Secret level -- Contractor must have
in-house facilities to conduct long-term endurance tests and analysis
capabilities for an anticipated 9 year period-Contractor must
demonstrate at least five years of life time performance testing on
converter thermoelectric elements with segmented legs of N-type
PbTe/BiTe and P-type PbSnTe/TAGS/BiTe -- -Destination is classified --
Delivery schedule: (1) field support activities: November 1997, as
required for years 1998 through 2006, (2) RTG refurbishment:
January/February/March 1998, as required for years 1999 through 2006,
(3) RTG regassing/safety inspection: August/September 1998, as required
for years 1999 through 2006, and (4) RTG Construction: preliminary
design review October 1998, final design review October 1999, Safety
Analysis Report January 2002, RTG delivery February 2002 and annually
thereafter until 2006 -- Intended duration of contract: September 30,
1997 -- September 29, 2006. This is not a request for a formal
quotation or proposal but is provided as information to the marketplace
and is an invitation for an expression of interest in the performance
of all work described. At this time, there is no planned
pre-solicitation conference. Responses must identify 01-97NE21501.000
and be received by this office within 15 days after publication of this
notice. SPONSOR: Department of Energy, ATTN: Document Control
Specialist, P.O. Box 2500, Washington, DC 20013 (0139) Loren Data Corp. http://www.ld.com (SYN# 0005 19970521\A-0005.SOL)
A - Research and Development Index Page
|
|