COMMERCE BUSINESS DAILY ISSUE OF MAY 21,1997 PSA#1850U. S. Army Engineer District, Savannah, P.O. Box 889, Savannah, Georgia
31402-0889 C -- DESIGN BUILD DEPOT PLANT SERVICES FACILITY, L.I. UHHZ880013,
FY-99, ROBINS AFB, GA SOL DACA21-97-R-0047 POC Derek Cudd, 912/652-5688
WEB: Corps of Engineers, Savannah District, Contracting,
http://www.usace.army.mil/sas/ct/index.html. E-MAIL: Leila Hollis,
leila.hollis@sas02.usace.army.mil. 1. CONTRACT INFORMATION: A-E
services are required for preparation of a RFP to design and build a
Depot Plant Services Facility, Option 1 -- Serve on the review team for
technical conformance of proposals. Option 2 -- Provide construction
phase services for the depot plant services facility. This will be a
firm fixed price contract. The contract is anticipated to be awarded in
June 1997 and completed in November 1997. The estimated construction
cost range is $10,000,000 to $20,000,000. This announcement is open to
all firms regardless of size. 2. PROJECT INFORMATION: The selected
firm will be required to perform the following services: Prepare a
design and build RFP for a 8,600 sm depot plant services facility that
consolidates repair and maintenance of industrial equipment and plant
distribution systems, equipment and facility engineering support,
installation, vehicle control, and the control and distribution of
tools and tool kits in support of the F15, C130 and C141 aircraft. The
solicitation package should encourage the use of governing national
building codes and performance specifications to the maximum extent
possible without sacrificing life safety or violating public law and
executive orders. This project will require a Value Engineering study
prior to proceeding with phase two design-build process. 3. SELECTION
CRITERIA: See Note 24 for general A-E selection process. The selection
criteria are listed below in descending order of importance (first by
major criteria and then by each sub-criterion). CRITERIA A-F are
primary. Criteria G thru I are secondary and will only be used as
"tie-breakers" among technically equal firms. A. Specialized Experience
and technical competence in (1) Preparation of requests for proposals
(RFPs) for design and build contracts for industrial buildings. (2)
Design of new industrial buildings. (3) Providing construction phase
services. (4) Use of CADD and translation into Intergraph. (5) Use of
MCACES cost estimating. B. Past performance on DOD and other contracts
with respect to cost control, quality of work and compliance with
performance schedules. C. Capacity to accomplish the work in the stated
contract period and to provide at least two each of the following
disciplines: architectural, structural, civil, electrical engineering,
mechanical and at least one in the following: topo survey crew,
industrial hygienist (asbestos), fire protection engineer. Please
disregard the "to be utilized" statement at Block 4 of SF 255 and show
the total strength of each discipline. D. Professional Qualifications
of key management and professional staff members. The design team must
include a Registered Fire Protection Engineer whose principle duties
are fire protection engineering or a Registered Architect or Registered
Engineer who is a full member in good standing of the Society of Fire
Protection Engineers (SFPE). E. Knowledge of locality as it pertains in
design and construction methods of projects in the geographic area of
this contract. F. Demonstrated success in prescribing the use of
recovered materials and achieving waste reduction and energy efficiency
in facility design. SECONDARY CRITERIA. G. Extent of participation of
Small Business (SB) including (Women Owned Small Business (WOSB)),
Small Disadvantaged Business (SDB), historically black colleges and
universities, and minority institutions in the proposed team, measured
as a percentage of the total estimated effort. H. Proximity to the
project site. I. Volume of DOD contract awards in the last 12 months as
described in Note 24. 4. SUBMISSION REQUIREMENTS: See Note 24 for
general submission requirements. Interested firms must submit ONE (1)
copy of SF 255 (11/92 edition) for prime and ONE (1) copy of SF 254
(11/92) for prime and all consultants to the following address: US Army
Engineer District, Savannah, ATTN: CESAS-EN-EA, 100 W. Oglethorpe,
Savannah, GA 31401-3640, not later than close of business the 30th day
after the date of this announcement. If the 30th day is a Saturday,
Sunday, or Holiday, the deadline is the close of business of the next
business day. NO FAXED SUBMITTALS WILL BE ACCEPTED. FIRMS MUST INCLUDE
PRIME's ACASS NUMBER in BLOCK 3 of SF 255. For ACASS INFORMATION: call
503/326-3459. Cover letters and extraneous materials (Brochures, etc.)
are not desired and will not be considered. PHONE CALLS are
DISCOURAGED unless ABSOLUTELY necessary. PERSONAL VISITS for the
purpose of discussing this announcement WILL NOT BE SCHEDULED. This is
NOT a REQUEST for a PROPOSAL. (0139) Loren Data Corp. http://www.ld.com (SYN# 0018 19970521\C-0003.SOL)
C - Architect and Engineering Services - Construction Index Page
|
|