|
COMMERCE BUSINESS DAILY ISSUE OF MAY 23,1997 PSA#1852U. S. Environmental Protection Agency, Contracts Management Division
(MD-33), Attention: CMB-A, Research Triangle Park, NC 27711 J -- MAINTENANCE SERVICE FOR EPA NATIONAL AIR AND RADIATION
ENVIROMENTAL LABORATORY SOL PR-NC-97-10208M1 DUE 061197 POC Lenora
Hilliard, 919-541-4392/James F. Kempf, 919-541-4392 17. The
Environmental Protection Agency (EPA) has a requirement for maintenance
service at the National Air and Radiation Environmental Laboratory
located in Montgomery, Alabama. THIS IS A COMBINED
SYNOPSIS/SOLICITATION FOR COMMERCIAL ITEMS PREPARED IN ACCORDANCE WITH
THE FORMAT IN SUBPART 12.6, AS SUPPLEMENTED WITH ADDITIONAL
INFORMATION INCLUDED IN THIS NOTICE. THIS ANNOUNCEMENT CONSTITUTES THE
ONLY SOLICITATION; PROPOSALS ARE BEING REQUESTED AND A WRITTEN
SOLICITATION WILL NOT BE ISSUED. The solicitation document and
incorporated provisions and clauses are those in effect through Federal
Acquisition Circular 37. The solicitation number is PR-NC-97-10208 and
it is being issued as a Request for Proposal (RFP). The contractor
shall provide the following: full service (preventative maintenance
labor, repair labor, and all materials, including replacement of any
component that fails during the duration of this contract) maintenance
coverage on all chillers, cooling towers, pumps, motors, air handlers,
air compressors, air dryers, humidifiers systems, scrubbers, exhaust
fans, variable speed drives, boilers, and direct digital control
systems, as shown on Attachment A-1, Equipment List. The equipment
shall be maintained and serviced in accordance with "Manufacturers'
Operating and Maintenance Manuals", incorporated herein by reference,
and the "Alliance Reciprocating Conditioning and Refrigeration
Equipment System Assurance Services" guide, also incorporated by
reference. The Manufacturer's Operating Manual, and the Alliance
Reciprocating Condition and Refrigeration Equipment System Assurance
Services guide are available for review at the Environmental Protection
Agency, Research Triangle Park, N.C. Anyone wishing to view these
manuals should contact Lenora Hilliard at 919-541-4392 to arrange a
time and place. The Contractor shall furnish all repair parts,
replacement parts, labor, refrigerant, lubricants, filters, chemicals
and make any necessary tests, inspections, repairs and adjustments as
required to properly maintain these systems as set forth in the
Manufacturers' Operating and Maintenance Manuals. The Contractor shall
carry in stock an inventory of the commonly used repair and
replacement parts to minimize downtown. These parts will include
bearings, belts, and filters. The Contractor shall provide a detailed
report after each inspection requirement plus any additional work
performed by the Contractor, i.e. parts, labor time, adjustments,
calibration, etc. The Contractor shall provide service with a response
time no greater than one working day after notification by the
Government on non-critical components of the building mechanical
systems. The Contractor shall provide service with a response time no
greater than three hours after notification by the Government on
computer room and radon chamber mechanical equipment. The computer room
and radon chamber mechanical equipment are classified as critical
components of the building mechanical systems. The Contractor's
projected preventative maintenance schedule must meet or exceed the
"Manufacturers' Operating and Maintenance Manuals" specifications,
incorporated herein by reference. If there is a discrepancy, the
"Manufacturer's Operating and Maintenance Manuals" requirements shall
prevail. The Contractor shall offer to the Government at least the same
warranty terms, including offers of extended warranties, offered to the
general public in customary commercial practice. The following FAR
provisions apply to this solicitation: 52.212-1,
Evaluation-Instructions to Offerors-Commercial; 52.212-2,
Evaluation-Commercial Items. Evaluation criteria to be included in
paragraph (a) of provision 52.212-2, which will be used to evaluate
offerors are as follows: (i) demonstrated technical capability and
availability of service engineers in preventative and remedial
maintenance of all (equipment) as defined in the Statement of Work of
this requirement; (ii) demonstrated ability of personnel to respond to
remedial maintenance requirements within one day of notification, and
the ability to provide a response time of three hours of notification
on computer room and radon chamber mechanical; and (iii) demonstrated
past performance in performing work like or similar to this
requirement; and (iv) price, in decreasing order of importance.
Technical and past performance, when combined, are significantly more
important than price. All offerors are to include with their offers a
completed copy of provision 52.212-3, Offeror Representations and
Certifications-Commercial Items. The following FAR clause applies to
this acquisition: 52.212-4, Contract Terms and Conditions-Commercial
Items. The following additional FAR clauses, which are cited in clauses
52.212-5 are applicable to the acquisition: 52.203-6, Restrictions on
Subcontractor Sales to the Government, with Alternate I; 52.203-10,
Price or Fee Adjustment for Illegal or Improper Activity; 52.219-8,
Utilization of Small Business Concerns and Small Disadvantaged Business
Concerns; 52.222-26, Equal Opportunity, 52.222-35, Affirmative Action
for Special Disabled and Vietnam Era Veterans, 52.222-36 Affirmative
Action for Handicapped Workers; 52.222-37, Employment Reports on
Special Disabled Veterans and Veterans of the Vietnam Era; 52.225-3,
Buy American Act-Supplies; 52.225-18, European Community Sanctions for
End Products; 52.225-21, Buy American Act -- North American Free Trade
Implementation Act-Balance of Payments Program. Offerors must submit
all technical questions concerning this solicitation in writing to the
Contract Specialist. A site visit of the Laboratory where the
equipment is located will be held on June 4, 1997, at 10:00 AM. The
laboratory is located on Gunter Air Force Base at the following
address: 540 South Morris Ave., Montgomery, Alabama. Firms planning to
attend should provide a written notification to the Contract
Specialist at least two days prior to the site visit date. EPA must
received questions no later than 10 calender days after the date of
this solicitation. EPA will not reference the source of the
questions.All bid/offerors should be submitted to Lenora Hilliard,
Contract Specialist, U.S. Environmental Protection Agency, MD-33,
Research Triangle Park, NC 27711, no later than by June 11, 1997, 4:30
PM EST, the due date and time for receipt of proposals. Courier
Delivery Address is U.S. Environmental Protection Agency,
Receptionist-Administration Bldg. Lobby, Attn: Lenora Hilliard, 79
Alexander Drive, Research Triangle Park, NC 27709. EQUIPMENT LIST
Attachment A-1 Equipment Description Quantity Operational Annual
Inspections Per Inspections Year 1. York AC 1HP 2 1 1 2. York Chillers
2 2 1 3. Liebert Unit 1 2 1 4. BAC Cooling Towers 2 1 1 5. AHU-1 W/VSD
1 1 1 6. AHU-2 1 1 1 7. AHU-3 W/VSD 1 1 1 8. AHU-4 1 1 1 9. AHU-5 1 1
1 10. AHU-6 W/VSD 1 1 1 11. Unit Heaters 23 0 1 12. HWP-1 1 0 1 13. P-1
& P-2 HWP W/Motor 2 0 1 14. P-3 & P-4 CHWP W/Motor 2 0 1 15. P-5 & P-6
CWP W/Motor 2 0 1 16. AHU-5 Humidity Pump 1 0 1 17. AHU-3 Humidity
Pump 1 0 1 18. AHU-2 Humidity Pump 1 0 1 19. Boiler 2 1 1 20. Water
Heater w/burner 1 1 1 21. Industrial Air 1 1 1 Compressor 22.
Industrial Air Dryer 1 1 1 23. Vacuum Pump 1 1 1 24. Scrubber
Components 24 3 1 25. 1 and one half HP 23 5 1 Exhaust Fan 26. Attic
Exhaust Fan and 16 0 1 Roof Mount 27. Digital Control System 1 1 1 By
Johnson Controls Inc. 28. Pneumatic Temperature 1 1 1 Control System By
Johnson Control Inc. 29. 3 HP Sewage Pumps 2 1 1 30. Fan Powered Term.
Boxes 18 0 1 31. Radon "A" Air Cooled 1 1 1 C.U. 32. Radon "A" Fans 3
5 1 33. Radon "A" Glycol 1 1 1 Chiller 34. Radon "A" Glycol 1 1 1 Pump
35. Radon "A" Motorized 9 5 1 Actuators 36. Radon "A" Desiccant 1 1 1
Drier 37. Radon "A" Ctl. Air 1 1 1 Compressor 38. Similar Radon "B"
Component Same as "A" above 39. Similar Radon "C" Same as "A" above 40.
Humidifiers 2 1 1 41. Room Thermostats -- 45 1 1 Calibrate 42.
Emergency Generator 1 1 1 43. UPS -- Computer Room 1 4 1 44. UPS --
Counting Room 1 4 1 45. Fans 51-53-54 & 55 4 1 1 46. Walk-in Cooler 1
1 1 (RM 319) 47. Electric Heaters 4 1 1 Room 701-702- 703-704 48.
Johnson Control 1 4 4 Metays System Note: Contract does not cover
Robert Shaw digital controller, associated sensors. Filter Change
Regularity Description Number of Filter Changes Per Year AHU-1 Four
(Pre Filter 60%) AHU-6 Four (Pre Filter 60%) AHU-5 Twelve (Pre Filter
60%) AHU-5 One (Bag Filer 95%) AHU-4 Twelve (Pre Filter 60%) AHU-4 One
(Pre Filter 95%) Liebert Four (Pre Filter 60%) AHU-3 Twelve (Pre
Filter 60%) AHU-3 One (Bag Filter 95%) AHU-2 Twelve (Pre Filter 60%)
AHU-2 One (Bag Filter 95% AHU-System 1 Two (Pre Filter 60%) AHU-System
2 Two (Pre Filter 60%) AHU-7 Twelve (Pre Filter 60%) (0141) Loren Data Corp. http://www.ld.com (SYN# 0062 19970523\J-0011.SOL)
J - Maintenance, Repair and Rebuilding of Equipment Index Page
|
|