COMMERCE BUSINESS DAILY ISSUE OF MAY 28,1997 PSA#1854Operational Contracting Division, 127 FW/LGC, 29553 George Ave., --
Bldg 303, Room 114, Selfridge ANG Base MI 48045-5399 Z -- SOLICITATION NOTICE, PROJECT VLZ972079, "AIRFIELD PAVEMENT
REPAIRS, TAXIWAYS A&F, RUNWAYS 10/28 &01/19" SOL DAHA2097BB011 DUE
071597 POC Ilene Nicholson, Contract Administrator or Paula J. DeShon,
Contracting Officer, (810)307-5867/5989 WEB: Operational Contracting
Division, 127 WG/LGC, Selfridge ANG Base MI, 131.4.32.81. E-MAIL:
Construction and Services Branch, Selfridge ANG Base MI,
inicholson@mimtc.ang.af.mil. Provide all plant, labor, materials,
equipment, supervision, and incidental services necessary to complete
airfield pavement repairs at Selfridge ANB Base, Michigan. Work
includes, but is not limited to, saw cutting and removal of portland
cement concrete (PCC), both full and partial depth, prep patch areas
including any base material disturbed, deliver, pour float, finish and
cure PCC; gather and test PCC samples; reestablish and seal joints and
overcuts; clean out and reseal existing joints; saw cut, mill and
remove asphalt pavement, prep asphalt surfaces, form butt joints and
install non-woven fabric per manufacturer's recommendations; deliver,
lay and compact asphalt paving; raise manholes to meet new grades;
provide and lay top soil and hydroseed; repaint disturbed lines and
airfield markings; provide clean-up and disposal of generated refuse
and debris during the execution of the project, as well as, final
clean-up. The project is broken down into four phases with Phase II
have firm start and enddates. Phase II includes the milling of existing
asphalt paving three inches deep, fourteen feet wide and approximately
6,100 feet long and the repaving of the milled area back to the
original grade. Phase II work cannot start before 12 August 1997 and
has a performance period of ten calendar days. Total project
performance period is 120 calendar days. Phase I includes approximately
1100 SY of full depth PCC pavement replacement and aproximately 130SY
of partial depth PCC repair. Phase III includes approximately 27,300 SY
of 4" asphalt overlay. Phase IV includes approximately 30 SY of partial
depth PCC repair. The estimated magnitude of construction is between
$500,000 and $1,000,000. This is an unrestricted solicitation. All
responsible sources may submit a bid which will be considered for
award. (0143) Loren Data Corp. http://www.ld.com (SYN# 0142 19970528\Z-0029.SOL)
Z - Maintenance, Repair or Alteration of Real Property Index Page
|
|