F -- ASCHOFF ROAD CULVERT REMOVAL SOL SOL R6-6-97-056Q DUE 062697 POC Contracting Section, 503/668-1621 This work consists of providing one crawler-mounted hydraulic excavator with operator, one front-end loader (crawler or tire mounted) with operator and one truck with trailer. The excavator will be used to remove 17 culverts and approximately 1900 cubic yards of fill material from 1.2 miles of road. The front-end loader will be used to move the excavated fill material to adjacent disposal sites and contour the slopes. The truck and trailer will be used to haul concrete barriers and erosion control materials to the construction site. Estimated contract time is 30 calendar days. Desired Start Work Date is July 15, 1997. See Numbered Note 1. (0147)