|
COMMERCE BUSINESS DAILY ISSUE OF JUNE 3,1997 PSA#1858Commanding Officer, Engineering Field Activity West, 900 Commodore Dr.
San Bruno, CA 94066-5006 C -- ARCHITECTURAL-ENGINEERING SERVICES FOR FY99 MCON PROJECT P-024,
EXPLOSIVE HANDLING APRON AT THE NAVAL AIR STATION, LEMOORE, CALIFORNIA
SOL N62474-97-C-1591 POC Teresa Marshall, Contracting Officer, (415)
244-2673. Architectural and engineering services are required for
project development, preparation of plans, specifications and
construction cost estimates for aircraft ordnance loading area with
taxiway and edge lightings; and the relocation of a small arms range.
Collateral equipment list, permit application preparation, hazardous
material investigation, construction support services, operation and
maintenance documentation preparation and development, and as-built
preparation may be required. The antipated construction cost for this
project is between $5,000,000 and $10,000,000. Firm fixed price
contract. Selection will be based on the following criteria which are
listed in descending order of importance: (1) Specialized experience of
the firm and consultants in the type of work required with special
emphasis on recent experience within the last five years in (a)
Designing similar aircraft ordnance loading apron and small arms range;
(b) On site functional analysis, space programming and budgetary cost
engineering; and (c) Designing projects to Navy design criteria. (2)
Professional qualifications (education, registration, relevant
experience) of the staff (in-house and/or consultant(s)) necesssary for
satisfactory performance of the required services. (3) Past performance
ratings by Government agencies and private industry with respect to
cost control, cooperation, quality of work, and compliance with
performance schedules. (4) Capacity to accomplish the work within a
reasonable time limit as demonstrated by adequate staffing to handle
the new workload. (5) Location in the general gedographical area of the
project and knowledge of probable site conditions, including
appropriate selectiuon of construction material and method and
applicable regulatory requirements. (6) Volume of work previously
awarded by the Department of Defense (DOD) for the past 12 months to
the firm with the objective of effecting equitable distribution of
contracts among qualified Architect-Engineer firms, including
minority-owned firms and firms that have not had prior DOD contracts.
DO NOT PROVIDE THIS INFORMATION SINCE THE GOVERNMENT HAS THE DATA.
Those firms which meet the requirements described in this announcement
and wish to be considered, must submit a SF 255. Submit a SF 254 only
if you have not done so in the past year. In order to expedite your
firm's consideration regarding the above criteria by the Board, the
following application data from the SF 255, Blocks 7, 8, and 10 should
be presented as follows: (Block 7) Provide a matrix for the design
team. Individual rows should be labeled with the team members' names
and their proposed team assignments. Columns should be labeled as
follows: firm name and office location; percent of time to be spent on
this team; professional registration and discipline; number of years
of professional experience; number of years with current firm; highest
education level and area of specialization (example: BS, mechanical
engineering). (Block 8) In matrix form, identify which team members
worked on the described projects. Individual rows should be labeled
with the projects' titles and project type. Columns should be labeled
with the team members' names. (Block 10) Include a tabular listing of
all performance ratings and letters of commendation from both private
and DOD clients since 1990. Provide a list of projects with
construction value over $500,000, that started construction since 1990
and include the following data for columns: client's contact and
current telephone number, client's need date, design completion date,
percent differentials between construction award amount and estimated
construction cost (note whether bid or negotiated). Provide a chart (in
number of hours) comparing design team's available capacity with their
actual commitments for the next 12 months. Firms selected for
interviews must submit thedir Design Quality Assurance Plan (DQAP) at
the interview, including an explanation of the management approach, an
organizational chart showing inter-relationship of management and
design team compoentns, and specific quality control process. The SF
255 with attachments shall be limited to 25 printed pages, 8.5" x 11"
with printing not smaller than 12 pitch. EVERY PAGE OF THE SUBMITTAL
(INCLUDING COVER LETTERS AND TABLE OF CONTENTS) THAT IS NOT A SF 254
WILL BE INCLUDED IN THE PAGE COUNT. Any page beyond the 25 printed page
limit will not be considered by the Selection Board. The submittal must
be received at Building 207, 2nd Floor, Attention: Deborah Levitan not
later than 3:00 P.M., Local Time, 17 July 1997. Submittals received
after this date and time will not be considered. Include telefax
numbers in Block 3a and DUNS number, Commercial Establishment and
Government Entity (CAGE) Codes, if known, and Taxpayer Identification
Number (TIN) in Block 3. Label lower right corner of outside mailing
envelope with "A-E Services, N62474-97-C-1591." This is not a Request
for Proposal (RFP). (0150) Loren Data Corp. http://www.ld.com (SYN# 0022 19970603\C-0002.SOL)
C - Architect and Engineering Services - Construction Index Page
|
|