COMMERCE BUSINESS DAILY ISSUE OF JUNE 10,1997 PSA#1863DA, Tulsa District, Corps of Engineers, PO Box 61, Tulsa, OK
74121-0061 Y -- ARKANSAS CITY, KANSAS LOCAL FLOOD PROTECTION PROJECT, ARKANSAS
RIVER, KANSAS SOL DACW56-97-B-0029 DUE 073197 POC Diane Cianci,
Contracting Division, 918-669-7270 The project will raise the existing
levee to the spf level of protection. The levee will be 5840.11 feet
in length and begins approximately 3900 feet north of Chestnut Avenue
and runs adjacent to the Arkansas River down to 738 feet north of
Madison Avenue. Approximately 71,100 yd of compacted impervious fill
material will be used to backfill the inspection trench and plate the
riverside slope of the levee. Approximately 241,200 yd of compacted
random fill material will be used to construct the main body of the
levee. Work will include clearing and grubbing, common excavation,
construction of earthen levee, mitigation pond, concrete pipe culvert
with flapgate, ramp at Chestnut Avenue, asphalt concrete pavement,
guardrails, toe drain, and relief wells. Estimated cost range of this
project is $1,000,000 to $5,000,000. An advanced non-refundable fee of
$10.00 (reduced size) or $25.00 (full size) is required for each set
of specifications. Make check payable to F&A Officer, USAED, Tulsa, and
mail to theattention of Contracting Division. Payment must be received
prior to issuance of plans and specifications. Plans and
specifications will be available on or about 30 June 1997. No phone
calls to order please. All orders will be mailed via first class mail.
Request for special handling (Fed-X, etc.) will not be honored.
(0157) Loren Data Corp. http://www.ld.com (SYN# 0123 19970610\Y-0021.SOL)