COMMERCE BUSINESS DAILY ISSUE OF JUNE 11,1997 PSA#186456 Contracting Squadron, 14100 W Eagle Street, Luke AFB, AZ 85309-1217 Y -- WATER SYSTEM REHABILITATION -- FT TUTHILL SOL F02604-97-B0007 POC
Lt Robert S. Williams (602) 856-3436 x280 or Capt Michael O'Connor
(602) 856-3432 WEB: HQ AETC CONTRACTING WEB PAGE,
http://www-contracting.aetc.af.mil/cgi-bin/afbop?list. E-MAIL: click
here to contact the contract administrator for this project via e-mail,
williamr@lukgate1.luk.aetc.af.mil. Contract award for this project is
contingent upon availability of funds. All bidders are hereby notified
that this project may not be awarded. The following is a summary of
work for project HLBC 96-1009 located at Flagstaff, Arizona. The
project shall include, but is not limited to: 1) the work consists of
all items required to construct a 105,000 gallon capacity steel tank,
25 feet in diameter and 29 feet in height, insulated to R-13, including
emersion heating system -- complete. 2) Install duplex booster pump 1.5
horsepower, 480V/3/60, ODP motors, a HEMA 1 control panel with motor
protection pilot lights. H-O-A switches, alternator and adjustable
pressure switch to provide LEAD-LAG pressure demand and automatic
alternation operation. 3) Install a UL/FM approved diesel engine driven
fire pump with a delivery capacity of 500 GPM at 75 PSIG boost, with an
engine driver rate for 40 BHP minimum at job site conditions flexible
coupling with guards, engine cooling line, muffler, flexible exhaust
connector, 1/2" automatic air release valve, suction and discharge
gauges, batteries, cables, HEMA 1 UL/FM labeled controller for manual
and automatic operation, adjustable pressure switch, built-in battery
charger, weekly test start, UL pressure chart recorder, fuel tank with
lines and fittings, 4" pilot operated main relief valve and 4" outside
hose valve test header with NGT valves, caps and chains, non-witnessed
performance testing, and all other items required for compliance with
the requirements of MFPA 20 regulations. The whole pumping unit
assembled on a commonsteel base, pre-plumbed, wired and tested. 4)
Install a steel framed, aluminum sided building with heating and
ventilation for the fire pump mentioned above. 5) The work also
includes installation of approximately 3,024 linear feet of six inch
inside diameter pipeline and all related appurtenances. (0160) Loren Data Corp. http://www.ld.com (SYN# 0101 19970611\Y-0011.SOL)
Y - Construction of Structures and Facilities Index Page
|
|