Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF JUNE 16,1997 PSA#1867

EFA Chesapeake, (Attn: Code 02AE), Washington Navy Yard, Bldg. 212, 901 M Street SE, Washington, DC 20374-5018

C -- REPAIR/REHAB ACADEMIC FACILITIES, U.S. NAVAL ACADEMY, ANNAPOLIS, MARYLAND SOL N62477-97-C-0082 DUE 071697 POC Contact Randolph Jones, 202-685-3152/Deborah Grant, KO, 202-685-3166 WEB: EFA Chesapeake Homepage, http://www.efdlant.navfac.navy.mil/efaches.htm. E-MAIL: Steven Moody, Contracting Officer, smoody@efaches.navfac.navy.mil. The work includes Architectural and Engineering Services necessary for the preparation of studies, plans and specifications and construction cost estimates ready for bidding for building renovation and construction at three academic buildings located at the U.S. Naval Academy, Annapolis, Maryland. Exterior work may include utilities, site grading, sidewalks, etc. The initial project is the renovation of Sampson Hall. Sampson Hall work will include changes to 70,000 + square feet of office, classroom, and laboratory spaces. Other buildings programmed for follow-on efforts include Mahan Hall, approximately 58,000 SF and Maury hall, approximately 73,000 SF. The development of these spaces includes new windows/entrance doors; new interior finishes; ADA upgrades; new partition layouts; Mechanical and Electrical upgrades and Building Code/Life Safety upgrades. Interior design services are required -- familiarity with mandatory sources of procurement, i.e., Federal Prison Industries (FPI), GSA schedules, etc. are required. The preparation of a comprehensive stormwater management and an erosion and sediment control plan for the state of Maryland may be required. The A/E contractor will require experience in historic preservation and educational facilities, including recent experience in electronic classroom technology. The possibility of hazardous materials, i.e., asbestos, lead paint, PCB, may exist at the project sites. The A/E contractor will be required to conduct hazardous material removal surveys, including testing and sampling, provide design removal procedures and prepare construction contract documents in accordance with applicable rules and regulations pertaining to such hazardous materials. All hazardous materials licenses and/or accreditation's necessary for the locality of the project site are required by the A/E firm or their subcontractor. The general intention is to provide for such design and engineering services as necessary to support the procurement of the various projects. Services, such astechnical reports and studies, site investigations, contract documents (drawings, specifications and construction cost estimates), surveys, shop drawings reviews, construction consultation and inspection, and construction record drawings, may be required at any time up to the final acceptance of all work. The selected firm for this contract will be required to participate in the first project's orientation and site visit meeting within seven days of notification and provide a fee proposal within ten days after receiving the Request for Proposal. This will be a firm fixed price A/E contract. The duration of the contract will be for multiple fiscal years. The estimated start date is October 1997. The estimated cost of construction is as follows: Mahan Hall, between $4 and $6 million; Maury Hall, between $7 and $8 million; and Sampson Hall, between $5 and $7 million. Selection evaluation criteria, in relative order of importance are included below. 1. Specialized experience and professional qualifications of the architectural/engineering firm (with its subcontractors), and the proposed project team in providing complete architectural/engineering services for the contract requirements as described herein; 2. Demonstrated capabilities in sustained accomplishment of work within established time limits; 3. Past performance and process of the prime A/E firm (and subcontractors) in an internal quality control/quality assurance (QC/QA) program to assure coordinated technically accurate studies and verification of costs, and accurate plans, specifications, and construction cost estimates; 4. The firm's and project team's present workload; 5. Preference will be given to firms with the capability of using CAD, SPECSINTACT and the Success Cost Estimating System. Each firm's past performance(s) and performance ratings will be reviewed during the evaluation process and can affect the selection outcome. Firms which meet the requirements listed in this announcement are invited to submit one copy each of the completed Standard Form (SF) 254 and SF 255, U.S. Government Architect-Engineer Qualifications, to the office indicated below. Site visits will not be arranged during the advertisement period. This proposed contract is being solicited on an unrestricted basis. Should the due date fall on a weekend or an official Government holiday, the SF 255 is due on the first workday thereafter. Firms having a current SF 254 on file with this office may also be considered. Interested firms are requested to include telefax numbers, the Contractor Establishment Code (CEC) and Taxpayer Identification Number (TIN) on the SF 254 and SF 255 in block 3a and 1, respectively. In block 10, state why your firm is specially qualified based on the selection evaluation criteria. Also, use block 10 to provide additional information desired by your firm. Only the SF 254 and SF 255 will be reviewed. Experiences identified in block 8 should not be more than 5 years old. The primary person proposed to be the direct contact with EFA CHES for the contract work mustbe identified as the "Project Manager". Information in the cover letter and any other attachments will not be included in the official selection process. Submit the SF 254 and 255 to the mail room in EFA CHES building, Building 212, by 3:30pm on the due date. Fax copies of the SF 254 and 255 will not be accepted. This is not a request for proposal. Selected firms may be subject to an advisory audit performed by the Defense Contract Audit Agency. EEO compliance is required. Because this contract acquisition could eventually result in an award over $500, 000.00, a subcontracting plan is required by large business concerns. The small disadvantaged set-aside goals in that subcontracting plan shall not be less than 5% of the subcontraced work. This set-aside goal of not less than 5 percent also applies to women-owned small business concerns. This does not apply if the prime firm is a small business concern. Effective 1 October 1997, A/E contractors will be required to register their firms in the Central Contractor Registration data base prior to receiving a contract award. This data base provides basic business information, capabilities, and financial information to the Government and complies with the Debt Collection Improvement Act of 1996, which requires Federal agencies to have the Taxpayer Identification Number of every contractor and to pay every contractor through electronic funds transfer. A/E contractors will only have to provide this information once with annual updates or as key company information changes occur. AVOID THE RUSH! Immediate Registration can be accomplished through the World Wide Web at http://www.acq.osd.mil/ec; through any DOD Certified Value Added Network; or a paper form may be obtained by calling the DOD Electronic Commerce Information Center at 1-800-334-3414. Contracting Officer, Naval Facilities Engineering Command, Engineering Field Activity, Chesapeake, Building 212, 901 M Street SE, Washington, DC 20374-5018. (0163)

Loren Data Corp. http://www.ld.com (SYN# 0018 19970616\C-0006.SOL)


C - Architect and Engineering Services - Construction Index Page