|
COMMERCE BUSINESS DAILY ISSUE OF JUNE 17,1997 PSA#1868Fleet and Industrial Supply Center, Norfolk Washington Detachment 901
M.Street, S.E. Bldg. 200 4th Flr., Washington Navy Yard, Washington, DC
203 41 -- RENOVATION OF EXISTING HVAC SYSTEM, USING HONEYWELL DDC CONTROLS
FOR THE RONALD REAGAN PRESIDENTIAL LIBRARY SOL N00600-97-R-2763 DUE
063097 POC For a copy of the solicitation, contact the Customer
Services Center, (202) 685-1299 or you may fax in your request to (202)
433-9569. For additional information, contact Mr. Courtney J. Edmonds,
Code 02W1.7F, (202) 685-1272, Contracting Officer, Illona M. Williams,
(202) 433-4264 Two-Step Sealed Bidding, Single Solicitation, Request
for Technical Proposal (Pre-Qualification) and Invitation for Bids
(IFB) for a Design/Build Project, Ronald Reagan Presidential Library,
40 Presidential Drive, Simi Valley, CA 93065. The Fleet and Industrial
Supply Center Norfolk, Detachment Washington (FISC), D.C. intends to
procure a design/build contract for renovation of the existing Ronald
Reagan Library HVAC system, including Honeywell DDC controls, on behalf
of the national Archives Records Administration. Procedure: The
two-step sealed bidding selection procedure using one solicitation will
be used. Requests for Technical Proposals (Pre-Qualification) will be
issued to interested design/build entities whose notification of
interest is received by the FISC Contracting Officer by 2:00 p.m. on 30
June 1997. Step one evaluation factors within the Request for Technical
Proposal shall include: Past Performance on similar HVAC projects;
financial resources of firm to complete the work; experience of
proposed designer in similar HVAC projects. Step-Two of the
design/build procurement, the IFB will be issued to only the five
highest qualified firms, determined from the evaluation of responses in
Step-One. FISC intends to issue the IFB on or about 21 July 1997 with
a 30 day response time and to award a fixed-price design/build contract
in August 1997. The facility will be occupied and in full use during
HVAC renovation, and consequently, construction phasing is an important
consideration under this project. (0164) Loren Data Corp. http://www.ld.com (SYN# 0243 19970617\41-0001.SOL)
41 - Refrigeration, Air Condition and Air Circulating Equipment Index Page
|
|