COMMERCE BUSINESS DAILY ISSUE OF JUNE 18,1997 PSA#1869USCG Engineering Logistics Center, Mail Stop 26, Bldg. 31, 2nd Floor,
2401 Hawkins Point Rd., Code 048, Baltimore, MD 21226-5000 J -- FINAL MACHINE WORK ON 2 ASSEMBLED RUDDERS SOL DTCG40-97-Q-80076
DUE 071697 POC Robert Orofino, Purchasing Agent, (410) 762-6503 CWO W.
Middleton, Contracting Officer, (410) 762-6499. Please Send Inquiries
to fax number (410) 762-6008. Provide contractor services to perform
final machine work on 2 each completely assembled rudders. Machine work
will be on the socket casting to conform with dimensions and tolerances
for all machined surfaces in accordance with reference A, detail 9-B.
At the discretion of the contractor there may be a relief cut required
at the lowest point of the keyway. The relief cut shall not exceed 1/8
inch beyond constant depth shown in detail 10-D. This relief is
required to allow metal chips to break away. This deviation is only
required if other than a milling process is used. Inspection and
acceptance shall be at the contractors facility for verification and
conformance. Additional information: A -- The AS cast diameter of the
taper is 1 1/2 inch smaller than the finished dimension. B -- The
bottom surface of the casting will be rough machined when received. C
-- The top and bottom surfaces may require a finish cut to achieve 5
foot 1/2 inch height and also be perpendicular to the centerline of the
fabricated rudder blades. D -- Allow plus/minus .015 inch for all
fractional dimension tolerances. E -- Transportation to and from
contractor's plant will be provided by USCG Yard truck. References: A.
USCG Plan NO. 378-FRAM-E-562-001 Rev. B, Rudder. B. Mil-Std-1689A(SH),
23 November 1990, Fabrication, Welding and Inspection of Ships
Structure. These references are available upon request to this office.
2) Prior to final machining contractor shall weld to repair all leaks
in castings/rudder bodies in accordance with Ref. B. After final
machining and in the presence of the Coast Guard inspector the
contractor shall perform an air test at 05 PSI with 0 drop in pressure
for a duration of 10 minutes to completed rudder assemblied to prove
that the rudder have 0 leaks including any leaks in socket castings.
Note: All dimensional readings and tests are to be documented. Both
rudders have been airtested at 2 PSI and found to be leaking through
the hub casing. This notice constitutes a request for quotations under
Simplified Acquisition Procedures. No other solicitation will be
issued. Please submit all quotes via telefax or mail to Mr. Orofino.
All responsive and responsible sources may submit a quote which will be
considered by this agency. See Note 9. (0167) Loren Data Corp. http://www.ld.com (SYN# 0050 19970618\J-0012.SOL)
J - Maintenance, Repair and Rebuilding of Equipment Index Page
|
|