|
COMMERCE BUSINESS DAILY ISSUE OF JUNE 19,1997 PSA#1870CO ENGFLDACT MW, Building 1A Suite 120, 2703 Sheridan Road, Great
Lakes, IL 60088-5600 Y -- HALSEY VILLAGE STORM SEWER, HALSEY VILLAGE, NTC, GREAT LAKES, IL
SOL N68950-97-C-0072 DUE 080697 POC LouAnn Smith/CONTRACT SPECIALIST
847-688-2600 EXT 116 WEB: na, na. E-MAIL: To contact the Contracting
Officer via e-mail: lksmith@pwcgl.navfac.navy.mil, na. The work
includes providing all labor, material, equipment, transportation and
supervision for the installation and construction of a reinforced
concrete storm relief sewer and all incidental and miscellaneious
related work. The work includes, but is not limited to installation of
reinforced concrete pipe of several diameters, concrete manholes and
inlets, outlet structures, riprap, asphalt and concrete pavement
removal and replacement, soil excavation and backfill, disposal and
removal of asbestos containing soil (special waste), tree removal and
disposal, landscape restoration and other related and necessary work.
This solicitation is being issued as an unrestricted procurement. The
estimated construction cost range is between $500,000 and $1,000,000.
The performance period is 120 calendar days. The SIC is 1623, size
standard is $17.0 million, and the FSC is Y244. An evaluation
preference will be given in accordance with DFARS 252.219-7008, "NOTICE
OF EVALUATION PREFERENCE FOR SMALL DISADVANTAGED BUSINESS
CONCERNS-CONSTRUCTION ACQUISITION-TEST PROGRAM". (APR 1996) Copies of
this solicitation will be available for purchase starting July 7, 1997
from JBR Blueprint Co. 1083 Corporate Circle, Suite D, Grayslake, Il
60030, POC Jim Johnson (847)223-3077, or Waukegan Blueprint 1401
Glenrock Avenue, Waukegan, IL 60079, POC Mike Tackett, (847)244-1395.
(0167) Loren Data Corp. http://www.ld.com (SYN# 0106 19970619\Y-0031.SOL)
Y - Construction of Structures and Facilities Index Page
|
|