COMMERCE BUSINESS DAILY ISSUE OF JUNE 25,1997 PSA#1874National Archives and Records Administration, Acquisitions Services
Division -- AMD-ACQ, 8601 Adelphi Road, Room 4400, College Park, MD
20740 V -- RELOCATE GEORGE BUSH PRESIDENTIAL LIBRARY/MUSEUM FROM 701
UNIVERSITY DR., EAST, COLLEGE STATION TO 1000 GEORGE BUSH DRIVE,
COLLEGE STATION, TEXAS SOL NAMASM97E0409 DUE 070897 POC Mr. Marty Cruz,
Purchasing Agent, 301-713-6755, ex 238 Movement of all Bush Library
official records, personal papers and memorabilia including 16,000
cubic feet of documents, 60,000 foreign and domestic gifts, and
estimated one million photographs. Contractor to provide all
management, supervision, labor, materials, tools and equipment, plan
schedule and coordinate the removal of all NARA furnishing, shelving,
records containers, gifts, computers, tables etc. Also, responsible for
the removal of storage containers from shelving by an approved means of
transfer, and replacement of containers onto shelving that has been
assembled at the new building. Containers wll be moved in such a manner
that containers will not be crushed or damaged. Contractor personnel
must be monitored and under the supervision of a designated NARA
employee at all times during the relocation of all government records.
Contractor will disassemble all shelving at the University Drive
location and and reassemble all shelving at the new building and move
all pallets. There are approximately 775 units of shelving, each unit
measuring approximately 4'x8'x2'. This includes shelving in all areas
of current facility, i.e., gift vault and main archives storage.
Required to security boxes, i.e, shrink wrap, banding, straps, etc.
Responsible for packing, moving, and unpacking of PC equipment
(printers, servers, monitors, hard drive units, keyboards, and
concentrates) and audiovisual equipment to the new facility to areas
designated by NARA personnel. Each box of archival materials will be
labeled by NARA personnel with numbers which correspond to the box's
designated shelf location at the new facility. The labels will include
row number, tier number and shelf location, as well as an individual
box number. This labeling will be done by NARA personnel prior to move
date. Boxes will be removed from the shelves by the contractor.
Shelves will be diassembled and moved to the new facility and
reassembled by contractor, each row, tier and shelf position numbered
by NARA personnel. Immediately reshelve boxes upon arrival according to
the location (row, tier, shelf position) listed on the box labels.
Gifts will be created by NARA prior to move and uncrated by NARA at new
location. Contractor is only responsible for moving crates to the new
location and into designated areas as directed by NARA. There are
appriximately 320 various sized wooden crates and 275 pallets of
cardboard boxes to be moved. Classified materials will be moved by
contractor by an approved means and escorted by Federal Police as
required by NARA security regulations. Contractot will be required to
coordinate his work with security personnel during the relocations of
these documents. All classified items will be required to be moved to
the new building and placed on ahelving in the security vault on the
same day and within twelve hours from the start of the transfer as
prescribed by NARA management. Contractor will provide the name, social
security number, and date of birth for personnel involved in the move
of classified materials at least 48hours before beginning the move
operation. Contractor will have access to loading dock area, leveling
dock apparatus and freight elevator to support the move. It is very
important that contractor utilize skilled, productive employees to
ensure satisfactory performance of the required services. Successful
offerors will be required to submit all applicable proofs of insurance
as required by Texas State Law. In addition to this offer, contractor
will provide a thorough explanation of their proposed means of
transfer, including their preferred means of transfer for the
materials, anticipated personnel levels and time requirements. The
government reserves the right to enter into either discussions for
clarification of or revision to the offerors work plan or to reject
offers based upon an unacceptable work plan or to reject offers based
upon a uncceptable work plan. Contractor will commence work on or about
August 18, 1997, and must complete the move of all items on or before
August 30, 1997. This notice constitutes a request for quatations. No
solicitation will be issued. Please submit all quotes via telefax
301-713-6910, or mail to Mr. Marty cruz Acquisition Services Div., 8601
Adelphi Road., Rm 3360, College Park, MD 20740-6001. All responsive and
reponsible sources may submit a quote which will be considered by this
agency, See Number Note 1. (0171) Loren Data Corp. http://www.ld.com (SYN# 0079 19970625\V-0001.SOL)