Y -- PRESOLICITATION NOTICE -- MCON FY98 PROJECT P-703/724, MAINTENANCE SUPPORT FACILITY AND SEAWALL UPGRADES, NAVAL AIR STATION, NORTH ISLAND, CORONADO, CALIFORNIA SOL N68711-95-R-7610 DUE 090197 POC Contract Specialist, Tina Collins/Contracting Officer, Janet Buyson. Presolicitation Notice -- The scope of work includes the furnishing of all labor, material, and equipment to construct a two-story maintenance support building with administration and engineering offices and storage, a container storage building, two laydown buildings, a mixed waste storage building and upgrades to an existing seawall; this includes site work, concrete work, masonry, structural steel, finishes, equipment, conveying systems, specialties, mechanical, electrical, and incidental related work, complete and ready for use. Contract duration is 365 calendar days. -- The contract is to be awarded to the responsible offeror who submits the proposal considered most advantageous to the Government considering "Price", "Technical", "Past Performance", and other evaluation factors. The following evaluation criteria has been established: Factor 1 (Price), Factor 2 (Technical), and Factor 3 (Past Performance). Within the "Technical" factor, the following subfactors are listed in order of importance: Subfactor "1" Construction Execution Plan, Subfactor "2" Corporate Resources, and Subfactor "3" Subcontracting Effort. Corporate Experience is the only subfactor under Past Performance. A proposed site visit is scheduled for 12 August 1997 at 8:00 a.m. Please contact John Dye at (619) 545-4880. A pre-proposal conference is tentatively set for 12 August 1997 at 10:00 a.m. local time at Southwest Division Naval Facilities Engineering Command, San Diego, CA. Participants must reserve seating a minimum of two (2) days in advance of the conference date by contacting Tina Collins at (619) 545-4899. -- This is not a public bid opening. -- The estimated cost is between $10,000,000 to $25,000,000. -- Firm Fixed Price Construction Contract. Bids will be considered from all responsible sources. -- This project is unrestricted. -- The Standard Industrial Code is 1542 and the annual size standard is $17 million. -- It is recommended the subcontracting plan goals reflect 7% for small disadvantaged business subcontracting effort. -- NOTE: Plans and specs will not be mailed to firms within a 20 mile radius of the issuing office. -- Solicitation packages may be acquired in person from Plan Issue or by mail. -- A fee will be charged for all plans and specifications and information regarding this may be obtained by calling Navy Plan Issue at (619) 532-2082, two weeks prior to plans and specifications availability. The fee is non-refundable. -- ONLY VISA/MASTERCARD CHARGE CARDS, CASHIER CHECKS AND MONEY ORDERS payable to DEFENSE PRINTING as payment for solicitation packages will be accepted. -- Telephone requests will not be accepted. -- Requests for the solicitation package must be in writing stating RFP number N68711-95-R-7610, with complete name, address, area code and phone number and whether bidding as a prime/subcontractor/supplier. Plan holders list will not be faxed. -- Mail requests to Southwest Division, Naval Facilities Engineering Command, ATTN: Navy Plan Issue, 1220 Pacific Highway, Bldg. 132, San Diego, CA 92132-5187. -- Submit one (1) check/payment per project. -- Solicitation packages are limited to two (2) per prime and one (1) per subcontractor/supplier. -- Plans and specifications will be available on or about 30 July 1997. (0171)

Loren Data Corp. http://www.ld.com (SYN# 0085 19970625\Y-0001.SOL)


Y - Construction of Structures and Facilities Index Page