COMMERCE BUSINESS DAILY ISSUE OF JUNE 27,1997 PSA#1876Sa-Alc/Aircraft Directorate, 375 Airlift Drive-Suite 1, Kelly Afb Texas
78241-6334 J -- C-5 FLAP SYSTEM SOL F41608-97-00000 DUE 070897 POC For copy, Fax
request to LAKA at (210)925-8812, For additional information contact
Borrego, R./laka/[210]925-5434 The USAF is conducting market research
to find a source to 1) provide engineering services for and 2) to
manufacture certain components of the C5 FLAP SYSTEM of the USAF C-5
transport aircraft. This system is a secondary flight control actuation
system used to extend and retract the trailing edge flaps of the C-5
transport aircraft. This system is comprised of 1 power drive unit, 2
asymmetry detector brakes, 1 slat clutch brake, 24 jack screw
assemblies, 106 torque tubes with u-joints, 24 actuator gearboxes, 3
step and angle gearboxes and 39 hanger and bearing assemblies. The 100
hp power drive unit provides actuation power not only to the flaps but
also to the slats through torque tubes and a clutch brake to the slats.
These components comprise a shipset of 200 components or Line
Replaceable Units (LRUs). This C-5 FLAP SYSTEM was originally designed
and built by the SPECO CORPORATION of Springfield Ohio. The firm is no
longer in operation, having been completely liquidated by bankruptcy.
As a result of the bankruptcy and the Government settlement agreement,
the USAF obtained possession of the following assets from SPECO
CORPORATION: 1) C-5 flap drive system drawing package 2) bills of
material 3) specifications listing 4) tooling and tooling drawings 5)
fixtures 6) process documentation 7) historical records and 8)
specialized test equipment built by SPECO. These items are stored at
the San Antonio ALC/Kelly AFB Texas. The Government makes no
representation that these assets constitute all that is required to
maintain and/or manufacture the C-5 FLAP SYSTEM. Neither does the
Government make any representation that the special tooling, fixtures
and test equipment are in a condition to manufacture any component. The
USAF is proposing to award a requirements contract with a minimum 5
year period of performance whereby the USAF would convey the above
assets to the successful contractor in an "AS IS" basis. The contractor
would 1) review/catalogue/update the drawings 2)
review/catalogue/update process sheets
3)inspect/catalogue/repair/upgrade and/or (if required) manufacture
tooling and fixtures 4) inspect/repair/upgrade and/or (if required)
manufacture special test equipment 5) manufacture selected components
of the FLAP SYSTEM. The contract is to be awarded IAW source selection
procedures. Market research will determine if the Government's need
may be met by a type of items or services customarily available in the
commercial marketplace that would meet the definition of a commercial
item at FAR Subpart 2.1. The solicitation will be issued at a date
tobe determined by market research. A separate Commerce Business Daily
notice will be used to advertise the actual solicitation. A
pre-solicitation conference will be held on 08 July 1997 at the
SAN-ANTONIO AIR LOGISTICS CENTER/KELLY AFB TEXAS. The address is given
in item 7 above. The contracting officer is Richard Borrego and may be
contacted at item 11. The purpose is to 1) develop/identify sources 2)
have participants review/inspect SPECO assets stored at SA-ALC 3) have
participants provide information pertaining to their
management/engineering/production capabilities for this requirement.
The pre-solicitation conferenceshall not be used as a method for the
prequalification of potential contractors. All participants are to
contact the contracting officer by 03 July 1997 by FAX. Detailed
instructions will then be sent to all who respond. The approximate
issue/response date will be 08 Jul 97. No telephone requests. Only
written or faxed requests received directly from the requestor are
acceptable. (0176) Loren Data Corp. http://www.ld.com (SYN# 0055 19970627\J-0018.SOL)