Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF JUNE 30,1997 PSA#1877

SOUTHWESTNAVFACENGCOM, 1220 Pacific Highway, San Diego, CA 92132-5187

Z -- ESR # 9404.502 (C9-94), UPGRADE OF EXISTING ELECTRICAL SYSTEM WITHIN EXISTING HOSPITAL FACILITY AT MARINE CORPS BASE, CAMP PENDLETON, CALIFORNIA SOL N68711-97-B-8301 DUE 081497 POC Mike Larson/Contract Specialist, 619-532-3802/Katherine G. Luhmann/Contracting Officer/For Plans and Specifications call Plan Issue at (619) 532-2082 PRESOLICITATION NOTICE -- The work includes the furnishing of all labor, approved materials and equipment required to complete the upgrade of the existing electrical system within the existing hospital facility. Project includes the removal and replacement of existing panelboards, the addition of HVAC equipment and secondary exits in the main electrical rooms, the removal and relocation of existing electrical equipment to correct National Electrical Code violations, and the installation of new branch circuit wiring and receptacles per the National Electrical Code, and incidental related work complete and ready for use. The work also includes the replacement of existing switchboard "EPDB-22" and the maintenance of all emergancy loads served by "EDPB-2", to be served by an on-site trailer-mounted generator set "TG-1". The generator set and required components shall be contained within the designated lay-down area. -- The estimated cost is between $500,000 and $1,000,000. -- Firm Fixed Price Contract. -- Contract duration is approximately 270 calendar days. -- This proposed contract will be unrestricted. -- The Standard Industrial Code is 1731 and the annual size standard is $17 million. It is recommended the subcontracting goals reflect a minimum goal of 5% for Small Disadvantaged Business Subcontracting effort. Bidders should request in writing stating IFB number N68711-97-B-8301, with complete name, address, area code and phone number and whether bidding as a prime/subcontractor/supplier. -- Telephone requests will not be accepted. -- There will be a charge for plans and specs that is yet to be determined. The fee will be non-refundable. -- The only methods of payment that will be accepted for plans and specifications are Visa, Mastercard, cashiers checks or money orders and they should be made out to DEFENSE PRINTING SERVICE. -- Mail requests to Southwest Division, Naval Facilities Engineering Command (Plan Issue), 1220 Pacific Highway, Bldg. 132, San Diego, CA 92132-5187 or fax requests to (619) 532-2083. -- Fax requests will be accepted but, WILL NOT be processed until your method of payment has been received by this office. -- Solicitation packages are limited to two (2) sets per prime and one (1) set per subcontractor/supplier. -- Bidders responding under this advertisement will not be required to resubmit request once formally advertised. -- Tentative issue date is on or about 14 July 1997 with an opening date of approximately 30 days later (NOTE: BOD stated above is TENTATIVE). -- Responses are due no later than 15 calendar days after publication of the advertisement in the CBD. (0176)

Loren Data Corp. http://www.ld.com (SYN# 0158 19970630\Z-0009.SOL)


Z - Maintenance, Repair or Alteration of Real Property Index Page