COMMERCE BUSINESS DAILY ISSUE OF JULY 11,1997 PSA#1885United States Postal Service, Major Facilities Office, 225 North
Humphreys Blvd, Memphis, TN 38166-0300 Y -- SIOUX FALLS, SOUTH DAKOTA PROCESSING & DISTRIBUTION CENTER NEW
CONSTRUCTION OWNED SOL 475450-97-A-0223 DUE 080897 POC Robert Fraga,
Purchasing Specialist, Fax 703-526-2747 WEB: U. S. POSTAL SERVICE,
www.usps.gov. E-MAIL: U. S. POSTAL SERVICE, jraley2001@aol.com. The
Postal Service is seeking Qualification Statements from construction
firms wishing to be prequalified for award of a firm fixed price
contract to construct a New Processing & Distribution Center (P&DC) in
Sioux Falls, South Dakota. The estimated cost range is between 8 and
12 million dollars. Firms will not be reimbursed for any expense
incurred in developing the qualification package. The scope of work
consists of constructing a new USPS-owned Processing and Distribution
Center of 181,000 square feet, which includes: offices space of 7,400
sq. ft., lockbox lobby 5,600 sq. ft., support 65,300 sq. ft., workroom
87,700 sq. ft., and platform 15,000 sq. ft.. The new building will be
a concrete slab on grade with spread footings, steel frame with
mezzanine, tilt up concrete panels, insulated membrane roof on metal
deck, metal canopy at the platform, and will have roof top units. The
project also includes 263 employee/customer parking spaces and 300
linear feet of dock spaces. A storm water detention pond will be
required. The facility will be constructed on a USPS owned greenfield
site with no known environmental problems. The facility will house mail
processing equipment. Also housed within the facility will be the
Processing and Distribution staff, limited district staff in direct
support of the P&D, maintenance staff, container repair, Bulk Mail
Entry Unit (BMEU) and Computerized Forwarding System (CFS) unit. The
construction completion time is 450 calendar days. Only the most highly
qualified contractors will be prequalified. To be considered for
Prequalification, the firm must be financially capable, have five (5)
years experience as a building contractor, and have completed three (3)
comparable projects completed within the past five (5) years.
"Comparable projects" are defined for the purposes of this solicitation
as a construction project of a light industrial or similarly complex
facility with a minimum size of 100,000 sq. ft. and a construction cost
of $6 million or more. Projects mustinclude the coordination or
installation of material handling systems. The contractors
Qualification Statement will be evaluated in accordance with the
following criteria listed in order of importance: Experience, Past
Performance, Organization, Backlog, Financial Capability, and a
Responsibility Verification. The USPS intends to issue a Request for
Proposal (RFP) to prequalified firms only. The USPS will select the
offeror that provides the Best Value to the Postal Service, taking into
consideration technical and cost related factors. Primary consideration
will be given to superior technical or management features rather than
the lowest overall cost. Prequalification packages are available now
and may be obtained by sending a written request or a facsimile (FAX
Number 901-385-2679) referencing the solicitation number and project
description to: Rapid Reproductions -- Attn.: USPS; 5300 Pleasant View
Rd., Memphis, TN 38134-6414. Prequalification statements are due by
close of business (4 p.m. EDST) August 8, 1997, Attn.: Mr. Robert
Fraga, Major Facilities Purchasing, 4301 Wilson Blvd., Suite 300,
Arlington, VA 22203-1861. Qualification statements will not be
returned. (0190) Loren Data Corp. http://www.ld.com (SYN# 0141 19970711\Y-0016.SOL)
Y - Construction of Structures and Facilities Index Page
|
|