Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF JULY 14,1997 PSA#1886

56 Contracting Squadron, 14100 W Eagle Street, Luke AFB, AZ 85309-1217

Y -- WATER SYSTEM REHABILITATION -- FT TUTHILL (FLAGSTAFF, AZ) SOL F02604-97-B0007 DUE 090297 POC Lt Robert S. Williams (602) 856-3436 x280 or Capt Mike O'Connor (602) 856-3432 WEB: HQ AETC CONTRACTING WEB PAGE, http://www-contracting.aetc.af.mil/cgi-bin/afbop?list. E-MAIL: click here to contact the contract administrator for this project via e-mail, williamr@lukgate1.luk.aetc.af.mil. Amended: The issue date for this solicitation has been changed to 1 August 1997. Proposals will be due to the contracting office on or before 2 September 1997. Contract award for this project is contingent upon availability of funds. All bidders are hereby notified that this project may not be awarded. The following is a summary of work for project HLBC 96-1009 located at Flagstaff, Arizona. The project shall include, but is not limited to: 1) the work consists of all items required to construct a 105,000 gallon capacity steel tank, 25 feet in diameter and 29 feet in height, insulated to R-13, including emersion heating system -- complete. 2) Install duplex booster pump 1.5 horsepower, 480V/3/60, ODP motors, a HEMA 1 control panel with motor protection pilot lights. H-O-A switches, alternator and adjustable pressure switch to provide LEAD-LAG pressure demand and automatic alternation operation. 3) Install a UL/FM approved diesel engine driven fire pump with a delivery capacity of 500 GPM at 75 PSIG boost, with an engine driver rate for 40 BHP minimum at job site conditions flexible coupling with guards, engine cooling line, muffler, flexible exhaust connector, 1/2" automatic air release valve, suction and discharge gauges, batteries, cables, HEMA 1 UL/FM labeled controller for manual and automatic operation, adjustable pressure switch, built-in battery charger, weekly test start, UL pressure chart recorder, fuel tank with lines and fittings, 4" pilot operated main relief valve and 4" outside hose valve test header with NGT valves, caps and chains, non-witnessed performance testing, and all other items required for compliance with the requirements of MFPA 20 regulations. The whole pumping unit assembled on a common steel base, pre-plumbed, wired and tested. 4) Install a steel framed, aluminum sided building with heating and ventilation for the fire pump mentioned above. 5) The work also includes installation of approximately 3,024 linear feet of six inch inside diameter pipeline and all related appurtenances. (0191)

Loren Data Corp. http://www.ld.com (SYN# 0154 19970714\Y-0026.SOL)


Y - Construction of Structures and Facilities Index Page