COMMERCE BUSINESS DAILY ISSUE OF JULY 14,1997 PSA#1886Directorate of Contracting, Contract Support Div Atzr QD, PO Box 33189,
Bldg 1950, Fort Sill Ok 73502-0189 Z -- REMOVE EXISTING WINDOWS & INSTALL NEW WINDOWS, REMOVE FENCE,
REPLACE EXISTING GATE TOP RAIL & HARDWARE AT USARC BOGALUSA, LA SOL
DABT39-97-B-0036 DUE 082997 POC Ramon Rodriguez (405) 442-4315/3225
Furnish all required plant, labor, equipment, and materials to complete
all work in accordance with the drawings and specifications. The work
to be performed includes the following principal features: Remove and
dispose of existing steel window units and provide and install new
aluminum, insulated, thermal-break, duo-pane, gray tinted glazing,
bronze, double hung windows. Remove any mini-blinds, blinds or curtains
as required to install units. Remove existing air conditioner window
unit and return to the government. Provide and install new mini-blinds
on all windows except windows indentified "W-3A". Reinstall any
removed curtains or other item removed during installation of new
window units. Paint all metal trim, exterior metal sills and other
exterior metal to match new window finishes. Repair all damaged
interior surfaces or finishes as results of window unit installation.
Windows shall be removed and installed the same day or temporary
security boarding of facility is required under this project. Remove
and dispose of existing fence fabric, tension bars, clamps, barbed
wire, and top and bottom tension wires. Amount of fence removed per day
is contingent upon installing new fabric at the close of each workday.
Square, straighten and align existing post and bracing rods before
providing and installing new 7' chain link fence fabric, tension bars,
clamps, hardware, 3 strands of new barbed wire and new top and bottom
tension wires. Remove and dispose of existing 20' double drive through
gate and hardware. Provide and install new 20' double drive through
gate with new 3 strand barbed wire top, brackets, 180 degree operating
hinges and hardware. Removal and installation shall be completed in
the same day. Remove and dispose of fence fabric and barbed wire on
existing 4' walk-in gate and replace with new 7' chain link fence
fabric and 3 strands of new barbed wire, brackets and hardware. Removal
and installation shall be completed in the same day. New fence and
gates, excluding roller gate shall be groundedas shown on grounding
detail and notes. Only corner and gate posts ground rod locations are
shown on drawing. However, ground rods shall be no more than 50 feet
apart or evenly spaced at 50 foot interval between corner post of fence
run. Existing 24' roller gate shall not have any work, except gate
posts shall be grounded as detailed in Note 5. Site shall be cleaned
daily and all debris, trash, materials removed and disposed of off-site
at no additional cost to the government. All work shall be coordinated
to meet building security requirements. The estimated issue date for
this project is July 29, 1997. This project is unrestricted and ranges
between $25,000.00 and $100,000.00, subject to the availability of
funds. Copy of the bid package may be requested in writing. (0191) Loren Data Corp. http://www.ld.com (SYN# 0248 19970714\Z-0070.SOL)
Z - Maintenance, Repair or Alteration of Real Property Index Page
|
|